DIS-4/M SRS
20
www.dallmeier.com
8
Commissioning
In order do continue the commissioning of the appliances, the module
carrier has to be installed in the rack. Notice the according documenta
-
tion “Commissioning DIS Module Rack”.
➡
Connect the device to the voltage supply.
The appliances inside the module carrier start automatically.
The power-LED glows.
➡
Connect a monitor with display port and a USB mouse to the first
appliance.
➡
Connect the monitor to the power supply.
➡
Switch on the monitor.
➡
Connect the module to the network.
The module can be configured via the network after approx. 45 seconds.
The start screen of SMAVIA Recording server is displayed.
If you want to use a USB keyboard for configuration in addition to
the mouse, you have to use an USB splitter, because there is only one
USB port availible.