background image

13

 

  

www.recal.cl        ·  

[email protected]       ·  

(+562) 2430 7700

11.2.5 FLUE

During the installation phase we recommend installing the flue at least 1 m higher than the roof
and everything else that is about 10 m near.

11.2.6 NATURAL DRAUGHT

The flue section and height must ensure that there is a depression of at least 10 Pa.(1 mm water
of column) on the fume pipe fitting end.

11.2.7 FORCED DRAUGHT

If particular conditions do not allow the generator to be equipped with a flue with the height
and/or section required, it might be necessary to provide the flue with a suction system so that a
depression of at least 10 Pa.(1 mm water of column) on the fume pipe fitting end is ensured.

11.2.8 COMBUSTION PRODUCTS

In case of fuel of little size, it is possible that the combustion products (fumes) are full of solid
residues with consequent emission of dusts from the flue.
In this case the flue must be equipped with a centrifugal dust separator.

11 – INSTRUCTIONS FOR THE INSTALLER (Foreign Countries)

The definition of the machine contained into the Directive 98/37/EEC can be applied to the
heat generator for solid fuel.
The Declaration of conformity and the EC mark certify the machine complying with the
Directive and the Harmonized Standard and the consequent free movement in the EU.
The machine can be used only after the installation.

The installation or the system are made up of:
− The distribution system of the heated fluid (water supply) complete with all that is
necessary to be carried out in safety (expansion tank open)
− The electric system to connect to the power supply
− The flue for the suction of the fumes produced

At the moment there are no European Harmonized Standard for this type of heat generator.
As a consequence of this the installation and the system are manufactured according to the
installation standard of a particular country.

The installer must manufacture the system and install the generator according to the current

national standard.

The manufacturer of the heat generator is not responsible in case of accidents, breakages
or bad working due to the not observance of the technical laws of the country in which the
equipment is installed.

Содержание CSL100

Страница 1: ...TERMOMECCANICA C da Cerreto 25 B MIGLIANICO CH Phone 39 0871 950329 Fax 39 0871 950687 SOLID FUEL HEAT GENERATOR SERIE CSL Models from 25 to 100 USE AND MAINTENANCE MANUAL www recal cl bio recal cl 5...

Страница 2: ...2 DESCRIPTION of the MACHINE PAGE 6 3 MACHINE GENERAL DATA PAGE 7 4 TRANSPORT HANDLING INSTALLATION PAGE 8 5 STARTING PAGE 9 6 CLEANING PAGE 10 7 MANTEINANCE PAGE 10 8 NOICE PAGE 11 9 PUTTING OUT OF S...

Страница 3: ...4 Technical Normative A N C C collection R 1978 D M 01 012 1975 0 4 Identification of the manufacturer The identification of the company D Alessandro Termomeccanica as Manufacturer is indicated accor...

Страница 4: ...Lack of maintenance as prescribed into this manual Failures and or breaks not due to the malfunction of the machine itself Reasons not due to the manufacturer The warranty is valid only to the origin...

Страница 5: ...chine has been conceived planned and built according to all the Safety Standards Although any possible reason of risk has been considered it is possible that besides the risks deriving from improper u...

Страница 6: ...t can be reached by means of an insulated door 6 the tube nest 8 that can be reached too for the cleaning operations trough the door 7 and the fume pipe fittings 16 The warm water delivery 9 and backf...

Страница 7: ...L100 115 100 Water Connections Model A mm B mm C mm D mm Flue mm Water Content l Gas DN CSL25 700 820 1400 1350 200 75 1 1 2 40 CSL40 700 920 1400 1350 200 100 1 1 2 40 CSL60 700 1170 1400 1350 200 14...

Страница 8: ...for the coupler with slings pict 2 4 3 Installation and testing Only when the machine is completely installed that is only when it is positioned and levelled connected to the hydraulic circuit connect...

Страница 9: ...l and the cock be provide with anti calcareous device The circulation pump work regularly ensuring the reduction of the water temperature in the boiler in case of overheating 5 2 Starting After perfor...

Страница 10: ...machine Fume pipe fittings The check and the cleaning of the amount of combustion residues in the fume pipe fitting 16 must be carried out every 15 days by means of the ash removal little door 15 Chec...

Страница 11: ...inlet Tube nest door 1 www recal cl bio recal cl 562 2430 7700 8 NOISE 8 0 General information The machine acoustic radiation pressure are not significant 8 1 Sound emission values Measurements carri...

Страница 12: ...11 2 PEFORMANCE OF THE INSTALLER 11 2 1 I S P E S L NOTIFICATION The thermal system for boilers with nominal output more than 34 8 KW 30 000 Kcal h must be done according a project decided by qualifie...

Страница 13: ...s The definition of the machine contained into the Directive 98 37 EEC can be applied to the heat generator for solid fuel The Declaration of conformity and the EC mark certify the machine complying w...

Страница 14: ...dictation however applicable it is of the Machine Directive 89 392 EEC 98 37 EEC Machines Safety 89 336 EEC 92 31 EEC 93 97 EEC Electromagnetic Compatibility CEI EN 60204 1 44 5 boards and devices on...

Отзывы: