Display Interconnections
9
2�
Place the drain wire of the line-to-line cable on the upper-left stud that holds the
.
3�
Place the 6-32 nut on
the stud and tighten it
with a 5/16" nut driver.
.
4�
Route the provided
line-to-line cable
from the host driver
jack J9 to the next
client display driver,
connecting to jack
.
5�
Run cable through the
knockouts located
on the display’s
backsheet and
be sure to use the
provided cable bushings that snap into place.
6�
Repeat until all displays are connected.
Note:
Do not connect the last display driver back to the host.
Important Notes:
• Route cables at least 6" (152 mm) away from interfering sources like ballasts,
florescent light bulbs, power sources, any type of motor, etc.
• Pull excess cable into the display cabinet, coil cable, zip tie it together and carefully
place coil inside the display cabinet.
Face 2
Face 1
Price 1
Price 2
Price 1
Price 2
Host Driver - Comm Attached
J10 - Line In
J9 - Line Out
J16 - Comm Port
LINE TO LINE
COMM
PORT
Figure 13:
Line-to-Line Cable Installation
Figure 11:
Installed Line-to-Line
Cable with Drain Wire
Figure 12:
Installed Drain Wire
Содержание FUELIGHT FL-3000 Series
Страница 52: ...This page intentionally left blank ...
Страница 54: ...This page intentionally left blank ...
Страница 56: ...This page intentionally left blank ...
Страница 60: ...This page intentionally left blank ...