6
|
Installation
Installer and user reference guide
80
RYYQ+RYMQ+RXYQ8~20U7Y1B
VRV IV+ heat pump
4P546228-1A – 2019.10
(a) Knockout hole has to be removed. Close the hole to avoid small animals or dirt from
entering.
X1A
c
d
a
b
a b
8~12 HP
14~20 HP
Fix to the indicated plastic brackets using field supplied clamping material.
a
Wiring between the units (indoor-outdoor) (F1/F2 left)
b
Internal transmission wiring (Q1/Q2)
c
Plastic bracket
d
Field supplied clamps
6.8.6 To connect the transmission wiring
The wiring from the indoor units must be connected to the F1/F2 (In‑Out)
terminals on the PCB in the outdoor unit.
Tightening torque for the transmission wiring terminal screws:
Screw size
Tightening torque (N•m)
M3.5 (A1P)
0.8~0.96
In case of single outdoor unit installation
F
1
F
2
F
1
F
2
Q
1
Q
2
F1
F1
F2
F2 Q1 Q2
F1 F2
F1 F2
F1 F2
F1 F2
F1 F2
F1 F2
b
c
a
d
e
TO IN/D UNIT TO OUT/D UNIT TO MULTI UNIT
A1P
a
Outdoor unit PCB (A1P)
b
Use the conductor of sheathed wire (2 wire) (no polarity)
c
Terminal board (field supply)
d
Indoor unit
e
Outdoor unit