background image

17 Commissioning

Installation and operation manual

35

RWEYQ8~14T9Y1B
VRV IV water-cooled system air conditioner
4P452190-1D – 2020.10

[2‑74]

Description

2

29°C

3 (default)

31°C

4

33°C

5

35°C

6

37°C

7

39°C

16.1.9

To connect the PC configurator to the
outdoor unit

X27A

a

b

c

2

3

4

5

H J

ST

X27A

A1P

a

PC

b

Cable (EKPCCAB*)

c

Outdoor unit main PCB

17

Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during the commissioning
and hand-over to the user.

After installation and once the field settings are defined, the installer
is obliged to verify correct operation. Therefore a test run MUST be
performed according to the procedures described below.

17.1

Precautions when commissioning

CAUTION

Do  NOT  perform  the  test  operation  while  working  on
the indoor units.

When performing the test operation, NOT only the outdoor
unit,  but  the  connected  indoor  unit  will  operate  as  well.
Working on an indoor unit while performing a test operation
is dangerous.

NOTICE

Be sure to turn ON the power 6 hours before operation in
order  to  have  power  running  to  the  crankcase  heater  and
to protect the compressor.

During test operation, the outdoor unit and the indoor units will start
up.  Make  sure  that  the  preparations  of  all  indoor  units  are  finished
(field  piping,  electrical  wiring,  air  purge,  ...).  See  installation  manual
of the indoor units for details.

17.2

Checklist before commissioning

After  the  installation  of  the  unit,  first  check  the  items  listed  below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.

You  read  the  complete  installation  and  operation
instructions,  as  described  in  the 

installer  and  user

reference guide

.

Installation

Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.

Field wiring

Be  sure  that  the  field  wiring  has  been  carried  out
according  to  the  instructions  described  in  the  chapter

"15  Electrical  installation"

  [

4

  28],  according  to  the  wiring

diagrams and according to the applicable legislation.

Power supply voltage

Check the power supply voltage on the local supply panel.
The  voltage  MUST  correspond  to  the  voltage  on  the
nameplate of the unit.

Earth wiring

Be  sure  that  the  earth  wires  have  been  connected
properly and that the earth terminals are tightened.

Insulation test of the main power circuit

Using  a  megatester  for  500  V,  check  that  the  insulation
resistance  of  2  MΩ  or  more  is  attained  by  applying  a
voltage of 500 V DC between power terminals and earth.
NEVER use the megatester for the transmission wiring.

Fuses, circuit breakers, or protection devices

Check  that  the  fuses,  circuit  breakers,  or  the  locally
installed  protection  devices  are  of  the  size  and  type
specified 

in 

the 

chapter 

"15.1 

Safety 

device

requirements"

  [

4

  28].  Be  sure  that  neither  a  fuse  nor  a

protection device has been bypassed.

Internal wiring

Visually  check  the  electrical  component  box  and  the
inside  of  the  unit  for  loose  connections  or  damaged
electrical components.

Pipe size and pipe insulation

Be  sure  that  correct  pipe  sizes  are  installed  and  that  the
insulation work is properly executed.

Stop valves

Be  sure  that  the  stop  valves  are  open  on  both  liquid  and
gas side.

Damaged equipment

Check  the  inside  of  the  unit  for  damaged  components  or
squeezed pipes.

Refrigerant leak

Check the inside of the unit on refrigerant leakage. If there
is  a  refrigerant  leak,  try  to  repair  the  leak.  If  the  repair  is
unsuccessful,  call  your  local  dealer.  Do  not  touch  any
refrigerant  which  has  leaked  out  from  refrigerant  piping
connections. This may result in frostbite.

Oil leak

Check  the  compressor  for  oil  leakage.  If  there  is  an  oil
leak, try to repair the leak. If the repairing is unsuccessful,
call your local dealer.

Air inlet/outlet

Check  that  the  air  inlet  and  outlet  of  the  unit  is  NOT
obstructed  by  paper  sheets,  cardboard,  or  any  other
material.

Содержание VRV IV RWEYQ-T9

Страница 1: ...lation and operation manual VRV IV water cooled system air conditioner English Installation and operation manual VRV IV water cooled system air conditioner RWEYQ8T9Y1B RWEYQ10T9Y1B RWEYQ12T9Y1B RWEYQ1...

Страница 2: ...8 19 20 21 22 23 24 25 Directivelor cu amendamentele respective Direktive z vsemi spremembami Direktiivid koos muudatustega Direktyvose su papildymais Direkt v s un to papildin jumos Smernice v platno...

Страница 3: ...S vastaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplot...

Страница 4: ...s not spin 13 8 2 15 Symptom The display shows 88 13 8 2 16 Symptom The compressor in the outdoor unit does not stop after a short heating operation 13 8 2 17 Symptom The inside of an outdoor unit is...

Страница 5: ...r reference guide Preparation of the installation reference data Detailed step by step instructions and background information for basic and advanced usage Format Digital files on http www daikineurop...

Страница 6: ...carrying wires are tautened before the earth wire is in case the power supply is pulled loose from the stress relief CAUTION Do NOT perform the test operation while working on the indoor units When pe...

Страница 7: ...ation CAUTION NEVER touch the internal parts of the controller Do NOT remove the front panel Some parts inside are dangerous to touch and appliance problems may happen For checking and adjusting the i...

Страница 8: ...ices ventilate the room and contact the dealer where you purchased the unit Do not use the system until a service person confirms that the portion where the refrigerant leaks is repaired 4 About the s...

Страница 9: ...ch 6 hours before operation 6 2 2 About cooling heating fan only and automatic operation Changeover cannot be made with a user interface whose display shows change over under centralised control refer...

Страница 10: ...humidity in your room with minimal temperature decrease minimal room cooling The micro computer automatically determines temperature and fan speed cannot be set by the user interface The system does...

Страница 11: ...ing for damage If damaged the unit may fall and result in injury NOTICE Do NOT wipe the controller operation panel with benzine thinner chemical dust cloth etc The panel may get discoloured or the coa...

Страница 12: ...unit manual Malfunction Measure The system operates but cooling or heating is insufficient Check if air inlet or outlet of outdoor or indoor unit is not blocked by obstacles Remove any obstacles and m...

Страница 13: ...stop Operation automatically restarts when the noise ceases 8 2 9 Symptom Noise of air conditioners Indoor unit A zeen sound is heard immediately after the power supply is turned on The electronic ex...

Страница 14: ...b Installation manual and operation manual c Additional refrigerant charge label d Installation information sticker e Fluorinated greenhouse gases label f Multilingual fluorinated greenhouse gases la...

Страница 15: ...ratures from 21 C DB to 32 C DB or 14 C WB to 25 C WB The ambient temperature around the unit should be above 0 C DB and below 40 C DB Relative humidity around the unit should be below 80 The water te...

Страница 16: ...l the water piping and field wiring front plate B has to be removed 13 2 2 To open the electrical component box of the outdoor unit NOTICE Do NOT apply excessive force when opening the electronic comp...

Страница 17: ...ery Determine the proper size using the following tables and reference figure only for indication In case of heat pump system A B B B C D F G E x y b a 3 1 2 4 5 1 2 VRV DX indoor unit 3 Branch select...

Страница 18: ...ed on the total capacity of the connected indoor units only in case RA DX indoor units are connected Total capacity index of connected indoor units Piping outer diameter size mm Gas pipe Liquid pipe 2...

Страница 19: ...ll the following restriction conditions A B C a c b A B C a To indoor units b Outdoor unit multi connecting piping kit first branch c Outdoor unit multi connecting piping kit second branch 14 2 Prepar...

Страница 20: ...on the piping between this shut off valve and the outdoor unit for cleaning by chemicals For cleaning and water draining of the outdoor unit long period of non use or during non use in winter install...

Страница 21: ...the design flow rate calculated by the hydronic engineer when designing the building system Correct valve selection is done when following conditions are met B C AND E A D For further selection requir...

Страница 22: ...ay enter the machine 14 3 6 Using the stop valve and service port To handle the stop valve Take the following guidelines into account Make sure to keep the appropriate stop valves open during operatio...

Страница 23: ...nect the vacuuming recovery unit through a manifold to the service port of all stop valves p p R410A N2 b c e a f g h d A C 1 D B a Pressure reducing valve b Nitrogen c Weighing scales d Refrigerant R...

Страница 24: ...ant piping for example water may have entered the piping first carry out the vacuum drying procedure below until all moisture has been removed All piping inside the unit has been factory tested for le...

Страница 25: ...for 1 hour the system may contain too much moisture In that case break the vacuum by pressurising with nitrogen gas to a gauge pressure of 0 05 MPa 0 5 bar and repeat steps 1 to 3 until all moisture h...

Страница 26: ...additional 0 5 kg of refrigerant per outdoor unit In case of heat recovery system Formula R X1 22 2 0 37 X2 19 1 0 26 X3 15 9 0 18 X4 12 7 0 12 X5 9 5 0 059 X6 6 4 0 022 1 04 A C R Additional refriger...

Страница 27: ...ks to each outdoor unit NOTICE The refrigerant charging port is connected to the piping inside the unit The unit s internal piping is already factory charged with refrigerant so be careful when connec...

Страница 28: ...flow rate is correct If not stop the pump immediately and carry out troubleshooting 14 6 4 To insulate the water piping The outdoor water piping MUST be insulated to prevent condensation during heatin...

Страница 29: ...g In case of heat recovery system B i a b f c f e g d c h j j i a Field power supply with earth leakage protector b Main switch c Earth connection d Outdoor unit e Indoor unit f User interface g BS un...

Страница 30: ...es using finishing tape as shown in figure below b a f c d f e f a Liquid pipe b Gas pipe c Finishing tape d High pressure low pressure gas pipe e Transmission wiring F1 F2 f Insulator 15 6 To route a...

Страница 31: ...e closed valve Select a flow switch contact of at least 15 V DC 1 mA Connect the flow switch to X2M terminals 5 and 6 In case of a multi outdoor unit system install one or more flow switches depending...

Страница 32: ...ng the current field setting value is possible In general normal operation can be resumed without special intervention after changing field settings Some field settings are used for special operation...

Страница 33: ...atus of the unit What How Changing and accessing the setting in mode 1 Once mode 1 is selected push BS1 one time you can select the wanted setting It is done by pushing BS2 Accessing the selected sett...

Страница 34: ...m 3 Each unit has a pump valve pump is OFF when slave unit does not operate Minimum water flow rate limit control To change the minimum water flow rate limit of the variable flow system change the set...

Страница 35: ...tion Check that the unit is properly installed to avoid abnormal noises and vibrations when starting up the unit Field wiring Be sure that the field wiring has been carried out according to the instru...

Страница 36: ...s 17 4 To perform a test run 1 Close all front panels in order to not let it be the cause of misjudgement except the electrical component box inspection opening service cover 2 Make sure all field set...

Страница 37: ...site publicly accessible The full set of latest technical data is available on the Daikin Business Portal authentication required 19 1 Service space Outdoor unit Make sure the space around the unit is...

Страница 38: ...pressor Double tube heat exchanger Liquid receiver Thermistor 20 Disposal NOTICE Do NOT try to dismantle the system yourself dismantling of the system treatment of the refrigerant oil and other parts...

Страница 39: ......

Страница 40: ...4P452190 1D 2020 10 Copyright 2017 Daikin 4P452190 1 D 0000000 Verantwortung f r Energie und Umwelt...

Отзывы: