17 Commissioning

Installation and operation manual

37

RXYQQ8~20U7Y1B
VRV IV Q+ series heat pump
4P546221-1B – 2020.10

17

Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during the commissioning
and hand-over to the user.

After installation and once the field settings are defined, the installer
is obliged to verify correct operation. Therefore a test run MUST be
performed according to the procedures described below.

17.1

Precautions when commissioning

CAUTION

Do  NOT  perform  the  test  operation  while  working  on
the indoor units.

When performing the test operation, NOT only the outdoor
unit,  but  the  connected  indoor  unit  will  operate  as  well.
Working on an indoor unit while performing a test operation
is dangerous.

NOTICE

Be sure to turn ON the power 6 hours before operation in
order  to  have  power  running  to  the  crankcase  heater  and
to protect the compressor.

During test operation, the outdoor unit and the indoor units will start
up.  Make  sure  that  the  preparations  of  all  indoor  units  are  finished
(field  piping,  electrical  wiring,  air  purge,  ...).  See  installation  manual
of the indoor units for details.

17.2

Checklist before commissioning

After  the  installation  of  the  unit,  first  check  the  items  listed  below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.

You  read  the  complete  installation  and  operation
instructions,  as  described  in  the 

installer  and  user

reference guide

.

Installation

Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.

Field wiring

Be  sure  that  the  field  wiring  has  been  carried  out
according  to  the  instructions  described  in  the  chapter
Connecting  the  electrical  wiring,  according  to  the  wiring
diagrams and according to the applicable legislation.

Power supply voltage

Check the power supply voltage on the local supply panel.
The  voltage  MUST  correspond  to  the  voltage  on  the
nameplate of the unit.

Earth wiring

Be  sure  that  the  earth  wires  have  been  connected
properly and that the earth terminals are tightened.

Insulation test of the main power circuit

Using  a  megatester  for  500  V,  check  that  the  insulation
resistance  of  2  MΩ  or  more  is  attained  by  applying  a
voltage of 500 V DC between power terminals and earth.
NEVER use the megatester for the transmission wiring.

Fuses, circuit breakers, or protection devices

Check  that  the  fuses,  circuit  breakers,  or  the  locally
installed  protection  devices  are  of  the  size  and  type
specified 

in 

the 

chapter 

"15.2 

Safety 

device

requirements"

  [

4

  31].  Be  sure  that  neither  a  fuse  nor  a

protection device has been bypassed.

Internal wiring

Visually  check  the  electrical  component  box  and  the
inside  of  the  unit  for  loose  connections  or  damaged
electrical components.

Pipe size and pipe insulation

Be  sure  that  correct  pipe  sizes  are  installed  and  that  the
insulation work is properly executed.

Stop valves

Be  sure  that  the  stop  valves  are  open  on  both  liquid  and
gas side.

Damaged equipment

Check  the  inside  of  the  unit  for  damaged  components  or
squeezed pipes.

Refrigerant leak

Check the inside of the unit on refrigerant leakage. If there
is  a  refrigerant  leak,  try  to  repair  the  leak.  If  the  repair  is
unsuccessful,  call  your  local  dealer.  Do  not  touch  any
refrigerant  which  has  leaked  out  from  refrigerant  piping
connections. This may result in frostbite.

Oil leak

Check  the  compressor  for  oil  leakage.  If  there  is  an  oil
leak, try to repair the leak. If the repairing is unsuccessful,
call your local dealer.

Air inlet/outlet

Check  that  the  air  inlet  and  outlet  of  the  unit  is  NOT
obstructed  by  paper  sheets,  cardboard,  or  any  other
material.

Additional refrigerant charge

The amount of refrigerant to be added to the unit shall be
written  on  the  included  "Added  refrigerant"  plate  and
attached to the rear side of the front cover.

Installation date and field setting

Be  sure  to  keep  record  of  the  installation  date  on  the
sticker  on  the  rear  of  the  upper  front  panel  according  to
EN60335‑2‑40 and keep record of the contents of the field
setting(s).

17.3

About the test run

NOTICE

Make  sure  to  carry  out  the  test  run  after  the  first
installation.  Otherwise,  the  malfunction  code 

  will  be

displayed  on  the  user  interface  and  normal  operation  or
individual indoor unit test run cannot be carried out.

The  procedure  below  describes  the  test  operation  of  the  complete
system. This operation checks and judges following items:

▪ Check  for  incorrect  wiring  (communication  check  with  indoor

units).

▪ Check of the stop valves opening.

▪ Judgement of piping length.

▪ Abnormalities  on  indoor  units  cannot  be  checked  for  each  unit

separately.  After  the  test  operation  is  finished,  check  the  indoor
units one by one by performing a normal operation using the user
interface.  Refer  to  the  indoor  unit  installation  manual  for  more
details concerning the individual test run.

Содержание VRV IV Q+ Series

Страница 1: ...ion and operation manual VRV IV Q series heat pump English Installation and operation manual VRV IV Q series heat pump RXYQQ8U7Y1B RXYQQ10U7Y1B RXYQQ12U7Y1B RXYQQ14U7Y1B RXYQQ16U7Y1B RXYQQ18U7Y1B RXYQ...

Страница 2: ...iejszymi poprawkami 18 19 20 21 22 23 24 25 Directivelor cu amendamentele respective Direktive z vsemi spremembami Direktiivid koos muudatustega Direktyvose su papildymais Direkt v s un to papildin ju...

Страница 3: ...staava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota TS...

Страница 4: ...8 2 15 Symptom The display shows 88 14 8 2 16 Symptom The compressor in the outdoor unit does not stop after a short heating operation 14 8 2 17 Symptom The inside of an outdoor unit is warm even whe...

Страница 5: ...tion manual Installation and operation instructions Format Paper in the box of the outdoor unit Installer and user reference guide Preparation of the installation reference data Detailed step by step...

Страница 6: ...NOT use taped wires stranded conductor wires extension cords or connections from a star system They can cause overheating electrical shock or fire Do NOT install a phase advancing capacitor because t...

Страница 7: ...of other parts must be done by an authorized installer and must comply with applicable legislation Units must be treated at a specialized treatment facility for reuse recycling and recovery By ensurin...

Страница 8: ...e WARNING Do NOT modify disassemble remove reinstall or repair the unit yourself as incorrect dismantling or installation may cause an electric shock or fire Contact your dealer In case of accidental...

Страница 9: ...range is only valid in case direct expansion indoor units are connected to the VRV IV system 6 2 Operating the system 6 2 1 About operating the system Operation procedure varies according to the combi...

Страница 10: ...al of the user interface 6 3 Using the dry program 6 3 1 About the dry program The function of this program is to decrease the humidity in your room with minimal temperature decrease minimal room cool...

Страница 11: ...operating in the horizontal direction It may cause dew or dust to settle on the ceiling or flap 6 5 Setting the master user interface 6 5 1 About setting the master user interface c c b b a a VRV rep...

Страница 12: ...from fan heaters gas cookers etc is present Always have qualified service personnel confirm that the point of leakage has been repaired or corrected before resuming operation 8 Troubleshooting If one...

Страница 13: ...anger gas temperature sensor malfunction outdoor Suction temperature sensor malfunction outdoor De icing temperature sensor malfunction outdoor Liquid temperature sensor after subcool HE malfunction o...

Страница 14: ...s because the user interface is intercepting noise from electric appliances other than the air conditioner The noise prevents communication between the units causing them to stop Operation automatical...

Страница 15: ...ESULT OF LEAK CHECK OPERATION REQUEST FOR THE INDICATION OF ADDITIONAL REFRIGERANT CHARGING AND LEAK DETECTION OPERATION RESULT BE SURE TO FILL OUT THE BLANKS WHICH ARE NEEDED FOR AFTER SALE SERVICES...

Страница 16: ...15 C a e c d d c b a VRV IV replacement heat pump outdoor unit b Refrigerant piping c VRV direct expansion DX indoor unit d User interface dedicated depending on indoor unit type e Cool Heat changeov...

Страница 17: ...a b c d e a Electrical component box cover b Front side c Power supply terminal block d Sealing material e Moisture and dirt could enter NOT allowed Allowed 13 3 Mounting the outdoor unit 13 3 1 To p...

Страница 18: ...and thickness and if the pipes and branch piping are not corroded If the existing field piping does not comply with the above conditions replace the existing field piping with field piping that meets...

Страница 19: ...34 9 1 0 38 1 41 3 1 1 a If annealed temper grade is 1 The refrigerant pipes and branches must meet the condition of design pressure 33 bar 3 3 MPa If it is NOT possible to confirm this use the refrig...

Страница 20: ...If the piping length between the outdoor units exceeds 2 m create a rise of 200 mm or more in the gas line within a length of 2 m from the kit If Then 2 m a b 2 m 2 m a 2 m 2 m 200 mm 200 mm b 2 m 2 m...

Страница 21: ...allowed Allowed Make sure that the total length of the piping connected to the joint is absolute straight for more than 500 mm Only if a straight field piping of more than 120 mm is connected more tha...

Страница 22: ...lve size mm Tightening torque N m when opening or closing Valve body Hexagonal wrench Service port 9 5 5 7 4 mm 10 7 14 7 12 7 8 10 15 9 14 16 6 mm 19 1 19 21 8 mm 25 4 14 2 7 To remove the spun pipes...

Страница 23: ...ant piping involves Checking for any leakages in the refrigerant piping Performing vacuum drying to remove all moisture air or nitrogen in the refrigerant piping If there is a possibility of moisture...

Страница 24: ...our 3 Should you fail to reach the target vacuum within 2 hours or maintain the vacuum for 1 hour the system may contain too much moisture In that case break the vacuum by pressurising with nitrogen g...

Страница 25: ...or manual charging This step is included in below procedure see To charge refrigerant 428 It can be skipped but charging will take longer then A flow chart is available which gives an overview of the...

Страница 26: ...kg 12 HP N 6 C2 0 kg C C1 C2 0 5 kg Metric piping When using metric piping replace the weight factors in the formula by the ones from the following table Inch piping Metric piping Piping Weight facto...

Страница 27: ...t on the additional refrigerant charge label Go to test run Step 4b Close valve B R Q R Q R Q Step 5 Connect valve A to refrigerant charge port Open all outdoor unit stop valves Proceed with automatic...

Страница 28: ...al refrigerant charge label Go to test run Following codes appear e 2 indoor temperature out of range and e 3 outdoor temperature out of range Push BS1 to leave program Charging is finished Fill in th...

Страница 29: ...6 Step 6a To automatically charge refrigerant INFORMATION The automatic refrigerant charging has limits as described below Out of these limits the system cannot operate the automatic refrigerant charg...

Страница 30: ...tial NOTICE Applicable legislation on fluorinated greenhouse gases requires that the refrigerant charge of the unit is indicated both in weight and CO2 equivalent Formula to calculate the quantity in...

Страница 31: ...nd select the next higher recommended fuse capacity Example Combining the RXYQQ30 by using the RXYQQ18 and RXYQQ12 Minimum circuit ampacity of the RXYQQ18 35 0 A Minimum circuit ampacity of the RXYQQ1...

Страница 32: ...or unit e Outdoor unit In case of multi outdoor unit installation F1 F2 F1 F2 Q1 Q2 Q1 Q2 A1P d d e f b a c Q1 Q2 a Unit A master outdoor unit b Unit B slave outdoor unit c Unit C slave outdoor unit d...

Страница 33: ...Power supply terminal block f Connect each power wire RED to L1 WHT to L2 BLK to L3 and BLU to N g Earth wire GRN YLW h Tie wrap i Cup washer j When connecting the earth wire it is recommended to perf...

Страница 34: ...he current field setting value and changing the current field setting value is possible In general normal operation can be resumed without special intervention after changing field settings Some field...

Страница 35: ...nit What How Changing and accessing the setting in mode 1 Once mode 1 is selected push BS1 one time you can select the wanted setting It is done by pushing BS2 Accessing the selected setting s value i...

Страница 36: ...et C 0 default Auto 2 6 3 7 4 8 5 9 6 10 7 11 2 9 Tc target temperature during heating operation 2 9 Tc target C 0 default Auto 1 41 3 43 6 46 2 20 Manual additional refrigerant charge 2 20 Descriptio...

Страница 37: ...ce of 2 M or more is attained by applying a voltage of 500 V DC between power terminals and earth NEVER use the megatester for the transmission wiring Fuses circuit breakers or protection devices Chec...

Страница 38: ...egment display idle Abnormal completion Indication of malfunction code on the 7 segment display Refer to 17 5 Correcting after abnormal completion of the test run 438 to take actions for correcting th...

Страница 39: ...rface s display or transmission wiring between the outdoor unit and the indoor unit Electronic expansion valve malfunction main Y1E A1P X21A Check connection on PCB or actuator Electronic expansion va...

Страница 40: ...tuator De icing temperature sensor malfunction R7T A1P X30A Check connection on PCB or actuator Liquid temperature sensor after subcool HE malfunction R5T A1P X30A Check connection on PCB or actuator...

Страница 41: ...alfunction Check if other indoor units have malfunction and confirm indoor unit mix is allowed Connection malfunction over indoor units or type mismatch R410A R407C RA Hydrobox etc Check if other indo...

Страница 42: ...d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm Layout A B C D A B Possibility 1 Possibility 2 5 a 10 mm b 500 mm c 10 mm d 500 mm e 20 mm f 900 mm a 50 mm b 500 mm c 50 mm d 500 mm e 100...

Страница 43: ...ed are listed below INFORMATION The wiring diagram on the outdoor unit is only for the outdoor unit For the indoor unit or optional electrical components refer to the wiring diagram of the indoor unit...

Страница 44: ...ion valve liquid cooling Y1S Solenoid valve main Y2S Solenoid valve accumulator oil return Y3S Solenoid valve oil 1 Z C Noise filter ferrite core Z F A2P A5P Noise filter with surge absorber Connector...

Страница 45: ...expansion valve main Y2E Electronic expansion valve sub cool Y3E Electronic expansion valve liquid cooling Y1S Solenoid valve main Y2S Solenoid valve accumulator oil return Y3S Solenoid valve oil 1 Y4...

Страница 46: ......

Страница 47: ......

Страница 48: ...4P546221 1B 2020 10 Copyright 2018 Daikin 4P546221 1 B 0000000Y Verantwortung f r Energie und Umwelt...

Отзывы: