
20
|
Electrical installation
Installer and user reference guide
104
RXYSA4~6A7V/Y1B
VRV 5-S system air conditioner
4P600330-1 – 2020.01
20.1.3 Guidelines when knocking out knockout holes
NOTICE
Precautions when making knockout holes:
▪
Avoid damaging the casing.
▪
After making the knockout holes, we recommend you remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
▪
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
b
c
a
a
Knockout hole
b
Burr
c
Sealant etc.
20.1.4 Guidelines when connecting the electrical wiring
Keep the following in mind:
▪
If stranded conductor wires are used, install a round crimp-style terminal on the
end of the wire. Place the round crimp-style terminal on the wire up to the
covered part and fasten the terminal with the appropriate tool.
b
a
a
Stranded conductor wire
b
Round crimp-style terminal
▪
Use the following methods for installing wires:
Wire type
Installation method
Single-core wire
c b
c
a
a
A
AA´
A´
a
Curled single-core wire
b
Screw
c
Flat washer
Содержание VRV 5-S Series
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ...4P600330 1 2020 01 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...