background image

12 Electrical installation

Installation and operation manual

13

VAM350~2000J8VEB
Heat reclaim ventilation unit
4P664011-1 – 2021.08

Multi bend

Reduced diameter. Do NOT reduce the duct diameter.

▪ The  minimum  bend  radius  for  flexible  ducts  is  as  follows:

(Øduct/2)×1.5

▪ To  prevent  air  leakage,  wind  aluminium  tape  around  the  section

where the duct flanges and the ducts are connected.

▪ Install  the  opening  of  the  supply  air  as  far  as  possible  from  the

opening of the room air.

▪ Use  ducts  with  a  diameter  that  fits  the  unit  model.  See  the  data

book.

▪ Install  the  two  outdoor  ducts  with  a  downward  slope  (minimum

1:50)  to  prevent  entry  of  rain  water.  Also  provide  insulation  for
both ducts, to prevent dew formation. (Insulation material: 25 mm
thick glass wool)

▪ If the temperature and humidity levels inside the ceiling are always

high, install ventilation inside the ceiling.

▪ Insulate the duct and the wall electrically when a metal duct has to

penetrate the metal lattice and wire lattice or the metal lining of a
wooden structure wall.

▪ Install the ducts in such a way that the wind CANNOT blow inside

the ducting.

▪ All  4  ducts  MUST  have  a  length  ≥1.5  m  (exception:  VAM  in

combination  with  optional  EKVDX,  see  EKVDX  operation  and
installation manual).

Models 350~1000

b

c

a

d

a

Name Plate

Models 1500+2000

d

c

e

e

f

a

Aluminium tape (field supply)

b

Insulation material (field supply)

c

Duct flange (accessories)

d

Slope minimum 1:50

e

Supply air

f

Room air

INFORMATION

For  more  information  about  duct  connections  in
combination  with  an  EKVDX  module,  refer  to  the  installer
and user reference guide of the EKVDX unit.

12

Electrical installation

CAUTION

See 

"2  Specific  installer  safety  instructions"

  [

4

  3]  to  make

sure this installation complies with all safety regulations.

12.1

Component electrical
specifications

Model

350

500

650

800

1000

1500

2000

Power supply

Voltage

220~240 V ± 10%.

Frequency

50/60 Hz

MCA (A)

1.56

2.08

2.80

4.39

4.90

8.78

9.80

MFA (A)

6

6

6

6

6

16

16

Fan motor

P (kW)

0.08×

2

0.08×

2

0.106

×2

0.21×

2

0.21×

2

0.21×

4

0.21×

4

FLA (A)

0.62×

2

0.83×

2

1.12×

2

1.76×

2

1.96×

2

1.76×

4

1.96×

4

MCA

Minimum Circuit Amps

MFA

Maximum Fuse Amps

P

Motor Rated Load

FLA

Full Load Amps

NOTICE

When  using  residual  current  operated  circuit  breakers,
make sure to use a high speed type 300 mA rated residual
operating current.

NOTICE

The  power  supply  MUST  be  protected  with  the  required
safety  devices,  i.e.  a  main  switch,  a  slow  blow  fuse  on
each phase and an earth leakage protector in accordance
with the applicable legislation.

NOTICE

See the engineering data book for details.

Содержание VAM-J8 Series

Страница 1: ...n and operation manual Heat reclaim ventilation unit English Installation and operation manual Heat reclaim ventilation unit VAM350J8VEB VAM500J8VEB VAM650J8VEB VAM800J8VEB VAM1000J8VEB VAM1500J8VEB V...

Страница 2: ...orabljajo v skladu z na imi navodili on vastavuses j rgmis t e standardi te ga v i teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodytus standartu...

Страница 3: ...troller 25 14 Commissioning 25 14 1 Checklist before commissioning 25 14 2 Checklist during commissioning 26 14 2 1 About the test run 26 15 Troubleshooting 26 15 1 Solving problems based on error cod...

Страница 4: ...the applicable legislation Make electrical connections to the fixed wiring All components procured on site and all electrical construction MUST comply with the applicable legislation WARNING After fin...

Страница 5: ...nd may cause accidents WARNING ALWAYS use multicore cable for power supply cables WARNING Use an all pole disconnection type breaker with at least 3 mm between the contact point gaps that provide full...

Страница 6: ...VDX In order to be effective the installed unit MUST be electrically powered at all times except for short service periods CAUTION Before accessing make sure to turn OFF the operation switch and disco...

Страница 7: ...OTICE NEVER wash the heat exchange element with water NEVER touch the heat exchange element paper because it can be damaged if it is forced Do NOT crush the heat exchange element To clean the heat exc...

Страница 8: ...e at all Check if there is no power failure Wait until power is restored and restart operation Check if no fuse has blown or breaker is activated Change the fuse or reset the breaker if necessary Chec...

Страница 9: ...VAM unit location Temperature 0 C DB 40 C DB Relative humidity 80 It is possible that due to condensation the paper heat exchanger deteriorates when the unit operates in conditions with high indoor hu...

Страница 10: ...ion is effective to reduce blowing noises When selecting installation materials consider the required volume of air flow and the acceptable level of noise for that particular installation When room ai...

Страница 11: ...pter PCB KRP2A51 in the installation box KRP1BA101 4 Follow the installation instructions provided with the option kits BRP4A50A KRP2A51 and KRP1BA101 5 Guide the PCB wire through the dedicated holes...

Страница 12: ...xample if 2 units are installed closely together only 1 inspection hole is required for maintaining or replacing filters heat exchange elements a b c a Control box b Service cover c Inspection hole Ke...

Страница 13: ...optional EKVDX see EKVDX operation and installation manual Models 350 1000 b c a d a Name Plate Models 1500 2000 d c e e f a Aluminium tape field supply b Insulation material field supply c Duct flan...

Страница 14: ...rminal Loose connections may reduce the protection For the controller wiring refer to the installation manual of the controller delivered with the controller Wiring example VRV HRV P1 P1 P1 P2 P2 P2 L...

Страница 15: ...ptional controller i Power supply cable j Wires for connection of additional external damper supplied accessory k Insulated splices closed barrel connector 0 75 mm field supply l Double or reinforced...

Страница 16: ...l controller Ii Power supply cable j Wires for connection of additional external damper supplied accessory k Insulated splices closed barrel connector 0 75 mm field supply l Double or reinforced insul...

Страница 17: ...e VAM is switched off The VAM main PCB provides a contact for an external damper PCB X24A a b c d a VAM b External damper c External damper earthing d Power source CAUTION Follow the instructions belo...

Страница 18: ...or the air conditioner The settings format e g 19 29 1 02 that are used in this chapter are composed of 3 parts divided by Mode number e g 19 29 where 19 is the mode number for group settings and 29 i...

Страница 19: ...n b to select a mode number Result The code display is blinking 3 To configure settings for individual units under group control press the Timer setting on off button c and select the number of the un...

Страница 20: ...29 C 30 C 8 Central zone link No Yes 9 Preheat time extension c 0 minutes 30 minutes 60 minutes 90 minutes 18 28 0 External signal g JC J2 Last command Priority on external input Priority on operation...

Страница 21: ...y system n OFF ON 1A 0 Fresh up operation k OFF ON a Factory settings are marked with a grey background b In case VAM and EKVDX are combined and the R32 safety system of the VAM is active the nighttim...

Страница 22: ...must be equal in order to have a balanced system Models 350 1000 Settings 19 29 2 and 19 29 3 Balance exhaust air and supply air with fan steps 1 15 based on the air flow curves see the databook and t...

Страница 23: ...ting 19 29 0 04 CANNOT be configured if the outside temperature is 10 C which is out of the operation range Setting 19 29 0 05 CANNOT be configured if the outside temperature is 5 C In this case error...

Страница 24: ...tdoor air is supplied to the room without heat exchange with the room air Time to clean filter indication When the filter pressure drop becomes too large the following message or icon is displayed at...

Страница 25: ...on of the heat reclaim ventilation units is linked to the air conditioners this indication may be displayed While this indication is displayed the heat reclaim ventilation units CANNOT be turned on or...

Страница 26: ...ion of the system turn on the power of the heat reclaim ventilation units Refer to the manual of the controller of each unit controller for air conditioner central controller etc to conduct a trial op...

Страница 27: ...power supply printed circuit board Symbols Field wiring Terminals Connectors Protective earth Noiseless earth Colours BLK Black BLU Blue BRN Brown GRN Green ORG Orange RED Red WHT White YLW Yellow Tr...

Страница 28: ...and operation manual 28 VAM350 2000J8VEB Heat reclaim ventilation unit 4P664011 1 2021 08 17 2 Service space 50 a 150 250 mm A B a Service space Models A B VAM350 500 900 mm 675 mm VAM650 1100 mm 700...

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ...4P664011 1 2021 08 Copyright 2021 Daikin 4P664011 1 0000000G Verantwortung f r Energie und Umwelt...

Отзывы: