Страница 1: ...INSTALLATION MANUAL AZQS71B2V1B AZQS100A7V1B AZQS125A7V1B AZQS140A7V1B AZQS100A7W1B AZQS125A7W1B AZQS140A7W1B Split System air conditioners...

Страница 2: ...0 Hz 220 240 V R410A 1 2 4 5 6 3 1 3 2 4 5 A B A E B C D H H1 L1 A A B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 A A B1 B1 B1 B1 B1 B1 B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L...

Страница 3: ...como se establece en A y es valorado positivamente por B de acuerdo con el Certi cado C 06 Nota delineato nel A e giudicato positivamente da B secondo il Certi cato C 07 A B C 08 Nota tal como estabel...

Страница 4: ...ositivamente da B secondo il Certi cato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acordo com o Certi cado C 09 A B C 10 Bem rk som anf rt i A og positivt vurderet...

Страница 5: ...lation work may result in accidents due to fall of equipment Make certain that all electrical work is carried out by quali ed personnel according to the local laws and regulations and this installatio...

Страница 6: ...e uctuates a lot such as that in factories In vehicles or vessels Where acidic or alkaline vapour is present Provide a logbook In accordance with the relevant national and international codes it may b...

Страница 7: ...he unit the fan can start rotating very fast until it breaks Refer to the gures for installation of this unit in a place where the wind direction can be foreseen Turn the air outlet side toward the bu...

Страница 8: ...r example if the drain water may splash on people provide the drain piping using a drain socket optional Make sure the drain works properly INSTALLATION SERVICING SPACE The numerical gures used in her...

Страница 9: ...stallation impossible Installation shall be done by a licensed refrigeration technician the choice of materials and installation shall comply with the applicable national and international codes In Eu...

Страница 10: ...end surfaces to prevent rusting Preventing foreign objects from entering Plug the pipe through holes with putty or insulating material procured locally to stop up all gaps as shown in the gure Insects...

Страница 11: ...an 30 C and the humidity is higher than RH 80 then the thickness of the sealing materials should be at least 20 mm in order to avoid condensation on the surface of the sealing Be sure to insulate the...

Страница 12: ...Evacuate the pipes and check vacuum 1 No pressure increase for 1 minute 2 Break the vacuum with a minimum of 2 bar of nitrogen Never pressurize more than 4 0 MPa 3 Conduct leak test by applying soap w...

Страница 13: ...Maximum total one way piping length of the table in paragraph Allowable pipe length and height difference on page 5 Table 2 Total charging amount unit kg NOTE National implementation of EU regulation...

Страница 14: ...e terminal connectors When installing the earth leakage breaker make sure that it is compatible with the inverter resistant to high frequency electrical noise to avoid unnecessary opening of the earth...

Страница 15: ...n Do not connect wires of different gauge to the same power supply terminal Looseness in the connection may cause overheating When connecting wires of the same gauge connect them according to the belo...

Страница 16: ...nctions according to the operation manual AZQS 71V1 100V1 125V1 140V1 100W1 125W1 140W1 Minimum circuit amps MCA a a Stated values are maximum values see electrical data of combination with indoor uni...

Страница 17: ...4 or L8 as an error code there is a possibility that either the stop valves are closed or that air inlet or air outlet are blocked If the error code U2 is displayed on the remote controller check for...

Страница 18: ...discharge pipe for W1 models only R3T Thermistor suction pipe for V1 models only R4T Thermistor suction pipe for W1 models only R4T Thermistor coil for V1 models only R5T Thermistor power module for...