![Daikin RZQ100HY4A Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/daikin/rzq100hy4a/rzq100hy4a_service-manual_2460014012.webp)
Procedure to Remove Thermistor
Si281317
10
Removal Procedure
8. Procedure to Remove Thermistor
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
Remove the front and top
panels in accordance with
the Procedure to remove
Outside Panel and others
1
In order to remove the
discharge pipe
thermistor, pinch the
mounting spring and
pull out this thermistor.
2
For the heat exchanger
distributor pipe
thermistor, pull the
clamp frontward and
then remove this
thermistor.
3
In order to remove the
outdoor air thermistor,
pull out this thermistor
frontward and then slide
it to the right.
4
For the suction pipe
thermistor, pull this
thermistor frontward
and then remove it.
Discharge pipe thermistor
Suction pipe thermistor
Heat exchanger distributor pipe
thermistor
Thermistor
Thermistor
Outdoor air thermistor
Thermistor
Thermistor
Clamp
Thermistor
Thermistor