17
|
Piping installation
Installer and user reference guide
87
RYYQ+RYMQ+RXYQ
VRV IV+ heat pump
4P546228-1C – 2021.11
Seal the piping and wiring intake holes using sealing material (field supply),
otherwise the capacity of the unit will drop and small animals may enter the
machine.
Example: passing piping out through the front.
a
a
Close the areas marked with "
". (When the piping is routed from the front
panel.)
▪
Only use clean pipes.
▪
Hold the pipe end downwards when removing burrs.
▪
Cover the pipe end when inserting it through a wall, to prevent dust and/or
particles entering the pipe.
17.2.9 To braze the pipe end
NOTICE
Precautions when connecting field piping. Add brazing material as shown in the
figure.
1
1
1
1
2
2
≤Ø25.4
>Ø25.4
▪
When brazing, blow through with nitrogen to prevent creation of large quantities
of oxidised film on the inside of the piping. This film adversely affects valves and
compressors in the refrigerating system and prevents proper operation.
▪
Set the nitrogen pressure to 20 kPa (0.2 bar) (just enough so it can be felt on the
skin) with a pressure-reducing valve.
a
b
c
d
e
f
f
a
Refrigerant piping
b
Part to be brazed
c
Taping
d
Manual valve
e
Pressure-reducing valve
f
Nitrogen
▪
Do NOT use anti-oxidants when brazing pipe joints.
Residue can clog pipes and break equipment.
Содержание RYYQ8U7Y1B
Страница 174: ......
Страница 175: ......
Страница 176: ...4P546228 1C 2021 11 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...