Daikin RXN09KEVJU Скачать руководство пользователя страница 1

INSTALLATION 
MANUAL

R410A Split Series

Models 
RXN09KEVJU

RKN09KEVJU

RXN12KEVJU

RKN12KEVJU

English

Français

Español

Installation manual

R410A Split series

Manuel d’installation

Série split R410A

Manual de instalación

Serie Split R410A

00_CV_3P272446-6.fm  Page 1  Friday, January 7, 2011  3:32 PM

Содержание RXN09KEVJU

Страница 1: ...RXN09KEVJU RKN09KEVJU RXN12KEVJU RKN12KEVJU English Fran ais Espa ol Installation manual R410A Split series Manuel d installation S rie split R410A Manual de instalaci n Serie Split R410A 00_CV_3P272...

Страница 2: ...at children will not play with them Children playing with plastic bags face the danger of death by suffocation Do not install unit in an area where flammable materials are present due to risk of explo...

Страница 3: ...amage and personal injury Be sure to install a ground fault circuit interrupter breaker Failure to install a ground fault circuit interrupter breaker may result in electrically shocks or fire personal...

Страница 4: ...wind it is recommended to install a baffle plate on the air discharge side of the outdoor unit In heavy snowfall areas select an installation site where the snow will not affect the unit Outdoor Unit...

Страница 5: ...When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necessary follow the procedures below 2 Drain work Heat p...

Страница 6: ...o the flare nuts and gas leakage Align the centers of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches A Check Flare s inner surface must be...

Страница 7: ...from gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no o...

Страница 8: ...tu fth F 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reaches 230 F 110 C max Choose heat insulation materials that will withstand this temperature 2 Be sure to insulate both the...

Страница 9: ...electric shock After closing the liquid stop valve close the gas stop valve within 3 minutes then stop the forced operation Facility Setting cooling at low outdoor temperature This function is limite...

Страница 10: ...k before wiring A protection plate is fixed for protection from the high voltage section Before staring wiring work dismount the protection plate by removing the 2 screws and dismount the conduit moun...

Страница 11: ...t operation for 3 minutes after it is turned off 1 3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts such as fin movement are working proper...

Страница 12: ...1102 HT 3P272446 6 M10B111 Two dimensional barcodeisacode for manufacturing 66163058 00_CV_3P272446 6 fm Page 2 Friday January 7 2011 3 32 PM...

Отзывы: