
Si341211
Procedure to Remove PCB and Electrical Component Box
Removal Procedure
5
2. Procedure to Remove PCB and Electrical
Component Box
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1
Remove the 2 fixing
screws (M5) of terminal
block mounting plate.
Preliminary preparation
Remove the top, front and
side panels according to the
"Procedure to Remove
Outside Panels".
2
Remove the fixing
screw (M5) above the
electrical component.
3
Release the hook of the
resin stay from the
terminal block mounting
plate.