![Daikin RoofPak RPS Series Скачать руководство пользователя страница 22](http://html2.mh-extra.com/html/daikin/roofpak-rps-series/roofpak-rps-series_installation-and-maintenance-manual_5694134022.webp)
IM 926-3 • ROOFPAK APPLIED SYSTEMS 22 www.DaikinApplied.com
Mechanical Installation
Figure 31: Welding of Hold Down Brackets—Unit Base, Cross-Sectional View
Figure 32: Shim Spacers on Hold Down Brackets
Unit base
Seismic hold down bracket
Unit power wiring
(by factory)
Unit control wiring
(by factory)
High temp
Insulation
Roof curb
Acceptable weld zone
Field attachment
weld
Weld
zone
.25
.50"
Unit base
Seismic hold
down bracket
Unit power wiring
(by factory)
Unit control wiring
(by factory)
Roof curb
Shim
spacer
It may be necessary for
the contractor to field
fabricate spacers or new
seismic hold-downs for
rooftop units having larger
overhang dimensions.
Содержание RoofPak RPS Series
Страница 71: ...Wiring Diagrams www DaikinApplied com 71 IM 926 3 ROOFPAK APPLIED SYSTEMS Figure 87 VFD Control SAF and RAF...
Страница 72: ...IM 926 3 ROOFPAK APPLIED SYSTEMS 72 www DaikinApplied com Wiring Diagrams Figure 88 VAV Control Inputs...
Страница 76: ...IM 926 3 ROOFPAK APPLIED SYSTEMS 76 www DaikinApplied com Wiring Diagrams Figure 90 Electric Heat Control...
Страница 129: ......