Si39-406
Points to Bear in Mind at the System Design
General Information
9
Note:
1. The division of the work should be thoroughly clarified. (This applies particularly to work relating to the
connection of control wiring, fitting of remote controller and central control panel, boundary work on areas
such as connection of drain piping and humidification supply piping, inspection and foundation)
2. Keep a constant check on the progress of the construction work to avoid deviations from the air
conditioning work schedule.
3. For sleeve and insert work the positions of ceiling girders should be confirmed and sleeve and insert
requirement, hole diameters, positioning and numbers decided. This is particularly important in the case of
sleeves for drain piping.
2.4
Points to Bear in Mind when Preparing the Contract
Drawings
The following points should be borne in mind when preparing the contract drawings from the
original drawings and the execution drawings.
The contract drawings for the air conditioning system are blueprints for the performance of the
necessary work which are drawn up on the basis of the original drawings in such a way that a
working balance is achieved between the specific requirements of each individual aspect of the
work.
Contract Drawing
Objectives include:
The drawings should be easily comprehensible to those carrying out the work.
The contents of the drawings should not be subject to subsequent alteration.
The following is a list of the main points to be considered when preparing contract drawings for
the System and should be used as a reference during this stage of the work:
Содержание REYQ96MTJU
Страница 1: ...Design Installation Testing Instruction R410A Heat Recovery 60Hz REYQ96MTJU Si39 406...
Страница 6: ...Si39 406 iv Table of Contents...
Страница 34: ...Installation Si39 406 28 General Information Flaring Procedure...
Страница 68: ...Installation Si39 406 62 General Information Caution Caution label 3P124617 4P124614...
Страница 114: ...Appendix Si39 406 108 General Information 3P135887 1...
Страница 124: ...Appendix Si39 406 118 General Information 7 8 Piping System Diagrams 7 8 1 Outdoor Unit REYQ96MTJU 4D045329...
Страница 126: ...Appendix Si39 406 120 General Information 7 8 3 BS Unit BSVQ36MVJ BSVQ60MVJ 4D045338...
Страница 127: ...Si39 406 Appendix General Information 121 7 9 Wiring Diagrams 7 9 1 Outdoor Unit REYQ96MTJU 3D044892A...
Страница 128: ...Appendix Si39 406 122 General Information 7 9 2 Field Wiring REYQ96MTJU 3D042647A...
Страница 156: ...Refrigerant Piping Si39 406 150 Installation Manual REYQ96MTJU...
Страница 158: ...Refrigerant Piping Si39 406 152 Installation Manual REYQ96MTJU...
Страница 230: ...Precautions for New Refrigerant R410A Si39 406 224 Precautions for New Refrigerant R410...
Страница 236: ...375 Park Avenue Suite 3308 New York N Y 10152 info daikinac com www daikinac com...