NOTICE

If  the  power  of  some  units  is  turned  off,  the  charging
procedure cannot be finished properly.

NOTICE

In case of a multiple outdoor system, turn on the power of
all outdoor units.

NOTICE

Be sure to turn ON the power 6 hours before operation in
order  to  have  power  running  to  the  crankcase  heater  and
to protect the compressor.

NOTICE

If operation is performed within 12 minutes after the indoor
and outdoor units are powered on, the compressor will not
operate  before  the  communication  is  established  in  a
correct way between outdoor unit(s) and indoor units.

NOTICE

Before  starting  charging  procedures,  check  if  the
7‑segment  display  indication  of  the  outdoor  unit  A1P  PCB
is  as  normal  (see 

"To  access  mode  1  or  2"

  [

4

  36]).  If  a

malfunction  code  is  present,  see 

"19.1  Solving  problems

based on error codes"

 [

4

 40].

NOTICE

Make  sure  all  connected  indoor  units  are  recognised  (see
[1‑10] and [1‑39] in 

"Mode 1: Monitoring settings"

 [

4

 36]).

NOTICE

Close  the  front  panel  before  any  refrigerant  charge
operation is executed. Without the front panel attached the
unit cannot judge correctly whether it is operating properly
or not.

NOTICE

In case of maintenance and the system (outdoor unit+field
indoor  units)  does  not  contain  any  refrigerant  any
more (e.g., after refrigerant reclaim operation), the unit has
to  be  charged  with  its  original  amount  of  refrigerant  (refer
to  the  nameplate  on  the  unit)  by  pre-charging  before  the
automatic charging function can be started.

14.4.2

About charging refrigerant

Once  vacuum  drying  is  finished,  additional  refrigerant  charging  can
start.

There are two methods to charge additional refrigerant.

Method

See

Automatic charge

"Step 6a: To automatically charge
refrigerant"

 [

4

 30]

Manual charge

"Step 6b: To manually charge
refrigerant"

 [

4

 31]

INFORMATION

Adding refrigerant using the automatic refrigerant charging
function  is  not  possible  when  Hydrobox  units  are
connected to the system.

To speed up the refrigerant charging process, it is in case of larger
systems  recommended  to  first  pre-charge  a  portion  of  refrigerant
through the liquid line before proceeding with the actual automatic or
manual charging. This step is included in below procedure (see 

"To

charge  refrigerant"

  [

4

  29]).  It  can  be  skipped,  but  charging  will  take

longer then.

A flow chart is available which gives an overview of the possibilities
and  actions  to  be  taken  (see 

"To  charge  refrigerant:  Flow

chart"

 [

4

 27]).

14.4.3

To determine the additional refrigerant
amount

INFORMATION

For  final  charge  adjustment  in  the  test  laboratory,  please
contact your local dealer.

NOTICE

The  refrigerant  charge  of  the  system  must  be  less  than
100  kg.  This  means  that  in  case  the  calculated  total
refrigerant charge is equal to or more than 95 kg you must
divide  your  multiple  outdoor  system  into  smaller
independent  systems,  each  containing  less  than  95  kg
refrigerant  charge.  For  factory  charge,  refer  to  the  unit
name plate.

Formula:

R=[(X

1

×

Ø22.2

)×0.37+(X

2

×

Ø19.1

)×0.26+(X

3

×

Ø15.9

)×0.18+

(X

4

×

Ø12.7

)×0.12+(X

5

×

Ø9.5

)×0.059+(X

6

×

Ø6.4

)×0.022]×1.04+(A+B

+C)

R

Additional refrigerant to be charged [in kg and rounded off
to 1 decimal place]

X

1...6

Total length [m] of liquid piping size at 

Øa

A~C

Parameters A~C

Parameter  A.

  If  the  total  indoor  unit  capacity  connection  ratio

(CR)>100%,  charge  an  additional  0.5  kg  of  refrigerant  per  outdoor
unit.

Parameter B

. In case of a multi-outdoor-unit system, add the sum of

the individual outdoor unit charge factors.

Model

B

REMQ5+REYQ8~12

0 kg

REYQ14

1.3 kg

REYQ16

1.4 kg

REYQ18

4.7 kg

REYQ20

4.8 kg

Parameter C. 

When using more than one multi BS unit, add the sum

of the individual BS unit charge factors.

Model

C

BS1Q10

0.05 kg

BS1Q16

0.1 kg

BS1Q25

0.2 kg

BS4Q

0.3 kg

BS6Q

0.4 kg

BS8Q

0.5 kg

BS10Q

0.7 kg

BS12Q

0.8 kg

BS16Q

1.1 kg

Metric piping.

 When using metric piping, replace the weight factors

in the formula by the ones from the following table:

Inch piping

Metric piping

Piping

Weight factor

Piping

Weight factor

Ø6.4 mm

0.022

Ø6 mm

0.018

Ø9.5 mm

0.059

Ø10 mm

0.065

Ø12.7 mm

0.12

Ø12 mm

0.097

Ø15.9 mm

0.18

Ø15 mm

0.16

Ø16 mm

0.18

Ø19.1 mm

0.26

Ø18 mm

0.24

Содержание REYQ8U7Y1B

Страница 1: ...lation and operation manual VRV IV heat recovery English Installation and operation manual VRV IV heat recovery REYQ8U7Y1B REYQ10U7Y1B REYQ12U7Y1B REYQ14U7Y1B REYQ16U7Y1B REYQ18U7Y1B REYQ20U7Y1B REMQ5...

Страница 2: ...p niejszymi poprawkami 18 19 20 21 22 23 24 25 Directivelor cu amendamentele respective Direktive z vsemi spremembami Direktiivid koos muudatustega Direktyvose su papildymais Direkt v s un to papildin...

Страница 3: ...vastaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota...

Страница 4: ...lay shows 88 14 8 2 16 Symptom The compressor in the outdoor unit does not stop after a short heating operation 14 8 2 17 Symptom The inside of an outdoor unit is warm even when the unit has stopped 1...

Страница 5: ...st read before installing Format Paper in the box of the outdoor unit Outdoor unit installation and operation manual Installation and operation instructions Format Paper in the box of the outdoor unit...

Страница 6: ...e side Do NOT use taped wires stranded conductor wires extension cords or connections from a star system They can cause overheating electrical shock or fire Do NOT install a phase advancing capacitor...

Страница 7: ...nsuring this product is disposed of correctly you will help to prevent potential negative consequences for the environment and human health For more information contact your installer or local authori...

Страница 8: ...vice personnel confirm that the point of leakage has been repaired or corrected before resuming operation WARNING Stop operation and shut off the power if anything unusual occurs burning smells etc Le...

Страница 9: ...ly is turned off during operation operation will restart automatically after the power turns back on again 6 2 2 About cooling heating fan only and automatic operation Changeover cannot be made with a...

Страница 10: ...ration if the room temperature is low 20 C 6 3 2 To use the dry program WITHOUT cool heat changeover remote control switch To start 1 Press the operation mode selector button on the user interface sev...

Страница 11: ...e Only the master user interface can select heating or cooling mode 7 Maintenance and service NOTICE NEVER inspect or service the unit by yourself Ask a qualified service person to perform this work W...

Страница 12: ...he malfunction code If the system does NOT operate properly except for the above mentioned cases and none of the above mentioned malfunctions is evident investigate the system in accordance with the f...

Страница 13: ...ation System mismatch Wrong type of indoor units combined Indoor unit malfunction Connection malfunction over indoor units or type mismatch Centralised address duplication Malfunction in communication...

Страница 14: ...ise is heard In order to prevent oil and refrigerant from remaining in the system a small amount of refrigerant is kept flowing 8 2 10 Symptom Noise of air conditioners Indoor unit outdoor unit A cont...

Страница 15: ...E O6 4 x 0 022 105 CR 130 50 CR 105 50 CR 70 70 CR 85 85 CR 105 105 CR 130 8HP Total indoor unit capacity connection ratio CR 10 12HP 14 16HP 18 20HP 2 0 1 5 1 5 1 2 1 5 1 1 0 7 1 0 0 5 0 5 0 3 0 5 0...

Страница 16: ...on the heating capacity can go up till 168 kW and in cooling till 150 kW The outdoor unit is designed to work in heating mode at ambient temperatures from 20 C WB to 15 5 C WB and in cooling mode at a...

Страница 17: ...cal component box of the outdoor unit 417 For service purposes the pushbuttons on the main PCB need to be accessed To access these pushbuttons the electrical component box cover does not need to be op...

Страница 18: ...t piping 14 1 1 Refrigerant piping requirements NOTICE Refrigerant R410A requires strict cautions for keeping the system clean and dry Foreign materials including mineral oils or moisture should be pr...

Страница 19: ...Piping between refrigerant branch kit and indoor unit e Indoor unit Size up HP class Liquid piping outer diameter size mm 5 8 9 5 12 7 10 12 14 12 7 15 9 16 18 22 15 9 19 1 24 26 34 19 1 22 2 36 54 T...

Страница 20: ...the piping between outdoor units as shown in the 4 correct possibilities of the figure below a b b b a b b b a b a b a b a a a 200 mm a To indoor unit b Oil collects to the outmost outdoor unit when...

Страница 21: ...outdoor unit Install the joints horizontally so that the caution label a attached to the joint comes to the top Do not tilt the joint more than 7 5 see view A Do not install the joint vertically see v...

Страница 22: ...ce port cover securely For the tightening torque refer to the table below Check for refrigerant leaks after tightening the service port cover Tightening torques Stop valve size mm Tightening torque N...

Страница 23: ...ait to apply setting 2 21 until the outdoor unit has finished the initialisation Leak test and vacuum drying Checking the refrigerant piping involves Checking for any leakages in the refrigerant pipin...

Страница 24: ...o perform vacuum drying To remove all moisture from the system proceed as follows 1 Evacuate the system for at least 2 hours to a target vacuum of 100 7 kPa 1 007 bar 5 Torr absolute 2 Check that with...

Страница 25: ...ible when Hydrobox units are connected to the system To speed up the refrigerant charging process it is in case of larger systems recommended to first pre charge a portion of refrigerant through the l...

Страница 26: ...ing installation Installation and operation manual 26 REYQ8 20 REMQ5U7Y1B VRV IV heat recovery 4P546222 1B 2020 10 Inch piping Metric piping Piping Weight factor Piping Weight factor 22 2 mm 0 37 22 m...

Страница 27: ...rigerant overcharge happened recover refrigerant to reach R Q Step 2 3 Close valves C D and A Open valve B to the liquid line Execute pre charging amount Q kg Disconnect the manifold from the gas line...

Страница 28: ...en valve A Charge remaining amount of refrigerant P kg R Q P Depending on ambient conditions the unit will decide to perform autocharge operation in heating or cooling mode Close valve A Push BS3 to s...

Страница 29: ...ditional refrigerant amount via setting 2 14 Go to test run Following codes appear e 2 indoor temperature out of range and e 3 outdoor temperature out of range Push BS1 to leave program Charging is fi...

Страница 30: ...is connected to the piping inside the unit The unit s internal piping is already factory charged with refrigerant so be careful when connecting the charge hose After adding the refrigerant do not for...

Страница 31: ...mperature range for leak detection operation Retry when ambient conditions are satisfied Outdoor unit is out of temperature range for leak detection operation Retry when ambient conditions are satisfi...

Страница 32: ...EYQ40 14556 REYQ42 14735 REYQ44 15094 REYQ46 15634 REYQ48 16172 REYQ50 17071 REYQ52 17969 REYQ54 18868 INFORMATION Multi units are standard combinations 15 2 Safety device requirements The power suppl...

Страница 33: ...smission wiring Q1 Q2 c Plastic bracket d Field supplied clamps 15 5 To connect the transmission wiring The wiring from the indoor units must be connected to the F1 F2 In Out terminals on the PCB in t...

Страница 34: ...has to be removed Close the hole to avoid small animals or dirt from entering 15 8 To connect the power supply The power supply MUST be clamped to the plastic bracket using field supplied clamp mater...

Страница 35: ...an be monitored as well Mode 2 field settings Mode 2 is used to change the field settings of the system Consulting the current field setting value and changing the current field setting value is possi...

Страница 36: ...e process push BS1 to return to the default situation no indication on 7 segment displays blank refer to To access mode 1 or 2 436 16 1 5 To use mode 1 Mode 1 is used to set basic settings and to moni...

Страница 37: ...heating comfort setting 16 1 8 Mode 2 Field settings 2 0 Cool Heat selection setting 2 0 Description 0 default Each individual outdoor unit can select Cool Heat operation by Cool Heat selector if ins...

Страница 38: ...the outdoor unit exceeds 50 m the setting 2 49 has to be changed to 1 16 1 9 To connect the PC configurator to the outdoor unit X 2 7 A a b c 2 3 4 5 H J S T X27A A1P a PC b Cable EKPCCAB c Outdoor u...

Страница 39: ...has been bypassed Internal wiring Visually check the electrical component box and the inside of the unit for loose connections or damaged electrical components Pipe size and pipe insulation Be sure th...

Страница 40: ...operation will be possible after 5 minutes 17 5 Correcting after abnormal completion of the test run The test operation is only completed if there is no malfunction code displayed on the user interfac...

Страница 41: ...PCB X21A Check connection on PCB or actuator Electronic expansion valve malfunction lower heat exchanger Y3E main PCB X23A Check connection on PCB or actuator Electronic expansion valve malfunction su...

Страница 42: ...ection on PCB or actuator Upper heat exchanger gas temperature sensor R8T main PCB X29A Check connection on PCB or actuator Lower heat exchanger gas temperature sensor R9T main PCB X29A Check connecti...

Страница 43: ...tem test run An error occurred during the test run Re execute the test run Test run aborted Re execute the test run Test run aborted due to communication issues Check the communication wires and re ex...

Страница 44: ...de Leak detection function related Unit is not prepared to execute leak detection operation Refer to requirements to be able to execute leak detection operation Indoor unit is out of temperature range...

Страница 45: ...h obstacles F Front side Suction side In case of an installation site where sides A B C D have obstacles the wall heights of sides A C have no impact on service space dimensions Refer to the figure ab...

Страница 46: ...manual 46 REYQ8 20 REMQ5U7Y1B VRV IV heat recovery 4P546222 1B 2020 10 20 2 Piping diagram Outdoor unit Piping diagram 5 12 HP a b d e c a Stop valve liquid b Service port c Stop valve high pressure...

Страница 47: ...on and operation manual 47 REYQ8 20 REMQ5U7Y1B VRV IV heat recovery 4P546222 1B 2020 10 Piping diagram 14 20 HP a b d e c a Stop valve liquid b Service port c Stop valve high pressure low pressure d S...

Страница 48: ...es S1PH S2PH for 14 20 HP only 6 For 5 12 HP When using the optional accessory refer to the installation manual of the optional accessory 6 For 14 20 HP connector X1A M2F is red connector X2A M2F is w...

Страница 49: ...or for optional accessories X10A Connector bottom plate heater Legend for wiring diagram 14 20 HP A1P Printed circuit board main A2P A5P Printed circuit board noise filter A3P A6P Printed circuit boar...

Страница 50: ...inverter cooling Y6E Electronic expansion valve auto charge Y2S Solenoid valve liquid pipe Y3S Solenoid valve high pressure low pressure gas pipe Y4S Solenoid valve heat exchanger lower Y5S Solenoid v...

Страница 51: ......

Страница 52: ...4P546222 1B 2020 10 Copyright 2018 Daikin 4P546222 1 B 0000000Z Verantwortung f r Energie und Umwelt...

Отзывы: