• Outdoor Units • VRV HEAT RECOVERY • REYHQ16-24P
1
10
• VRV Systems • Outdoor Units
37
10
Operation range
REYHQ12P8
3D039566P / 4TW25797-3C
Cooling
Heating
Ou
tdo
or
te
m
per
at
ur
e
(°CDB)
Op
er
at
io
n r
ange
R
ang
e f
or
pu
ll do
wn
op
er
at
io
n
Out
doo
r tem
pe
ratu
re
(
°C
W
B
)
R
ang
e for
w
ar
m
ing up
op
er
ati
on
O
per
at
io
n ra
ng
e
NOTES
1
These figures assume the following
operation conditions:
Indoor and outdoor units:
Equivalent pipe length: 7.5m
Level difference: 0m
2
Depending on operation and installation
conditions, the indoor unit can change
over to freeze-up operation (indoor de-
icing).
3
To reduce the freeze-up operation (indoor
de-icing) frequency it is recommended to
install the outdoor unit in a location not
exposed to wind.
Indoor temperature (°CDB)
Indoor temperature (°CWB)