
W
IrIng
d
IagraMs
www.DaikinApplied.com 63
IM 893-10 • ROOFPAK SINGLEZONE UNITS
Figure 66: HTD Gas Burner Schematic
T1
_N
600
0
V
IT
11
5V
AC
R2
2
5
(L
1)
4
3
02
F
L2
G
3k
1
6k
1
FD
FS
G
8
6
9
01
7
4k
1
2k
2
1
K1
1
K2
1
K5
CO
M
N
O
AS
R2
0
2
1
4
5
8
7
11
10
S3
T2
_11
5
VA
C
/
26
8
HL
22
SI
G_
1/
42
7
PL
19
1
PL
16
1
PL
16
2
PL
19
3
TB
3_
17
4
10
PL
19
2
5
9
1
3
5
13
14
PL
19
4
NB
R2
4
T1
_N
/ 1
6
8
PL
19
_5
13
14
S1
_1
/20
1
M
29
2
4
M
29
1
3
GV
4A
GV
4B
GV
1A
8
9
BM
4
6
SI
G_
2/
4
27
PL
18
6
T1
N/
1
68
LP
5
R
W
HP
5
R
B
op
tio
na
l
T3
T2
CO
M
NO
FA
N
LI
M
IT
FL
C
T7 T8
CO
M
NO
X7
EX
P
B
M
X2
X3
X1
T3
_2
4
VA
C
M
R2
2
5
9
GR
D
PL
18
3
M
X4
R2
4
5
9
PL
18
4
PL
18
5
+
VM
1
-
T2
T1
T3
_N
R2
0
13
14
DO
1
203
E
C1
DO
1
T2
_11
5
VA
C
/
26
8
T1
_N
/ 16
8
EX
P
B
168
A
PL
18
_8
HL
23
PL
19
9
1
2
1
2
LS
1
LS
2
PL
19
6
PL
19
7
PL
19
8
CO
M
NO
CO
M
NO
DO
2
EX
P
B
GV
1B
PL
18
2
PL
18
1
te
m
p
se
ns
or
Typical Sequence of Opera
tion
When 120V power is furn
ished through the system on/of
f switch (S1), through the burner on/of
f switch (S3), and through the high limit control (FLC), terminal #6 on the flame
safeguard (FSG) is po wered on a call for heat. Whenever power is restored to the flame safeguard, the flame safeguard will go
through a 10 second initiation period before the
prepurge period will begin
. The burner air control valve will be at minimum position during of
f cycles. Upon a call for heat or any other time that a prepurge cycle will occur
, the
Содержание RDT
Страница 60: ...IM 893 10 ROOFPAK SINGLEZONE UNITS 60 www DaikinApplied com Wiring Diagrams Figure 64 VFD Control SAF and RAF...
Страница 61: ...Wiring Diagrams www DaikinApplied com 61 IM 893 10 ROOFPAK SINGLEZONE UNITS Figure 65 VAV Control Inputs...
Страница 65: ...Wiring Diagrams www DaikinApplied com 65 IM 893 10 ROOFPAK SINGLEZONE UNITS Figure 67 Electric Heat Control...