48
Step 5: Perform a trial run
To commission the machine it is necessary (tick "
√
" the operations completed):
Check the proper connection of the fluid inlet and outlet piping to the thermal (if present) ex-
change coils (if present).
Vent the air from the heat exchange coils.
Check that there is a suitable siphon for all the water being drained.
Inspect the correct installation and adequate electrical connection of the energy recovery equip-
ment, together with a mechanical and electrical check.
Insert an anti-vibration coupling between the machine and the ducts.
Check the tightening of screws and bolts (especially those used to attach motors and fans).
Check the integrity of the anti-vibration supports and the various accessories.
Remove extraneous materials (e.g., assembly sheets, tools, clips, etc.) and dirt (footprints, dust, etc.)
from inside the sections.
Содержание Modular Plate
Страница 15: ...15 Notes...
Страница 28: ...28 Notes...
Страница 33: ...33 VDI 6022 6...
Страница 34: ...34 1 x TE8x35 1 x 8 5 1 x M8 2 x TE8x35 2 x 8 5 2 x M8 7...
Страница 43: ...43 3 4 5 x 1 100mm 100mm 250mm 250mm 250mm 10 100mm 5mm...
Страница 44: ...44 6 7 NO OK...
Страница 45: ...45 H2O SOAP 8...
Страница 46: ...46 9...
Страница 47: ...47 Notes...
Страница 62: ...62 Repair log DATE SERVICE TYPE TIME REQUIRED SIGNATURE...