![Daikin LRMEQ4BY1 Скачать руководство пользователя страница 40](http://html2.mh-extra.com/html/daikin/lrmeq4by1/lrmeq4by1_installer-and-user-manual_5695867040.webp)
14 About the system
Installer and user reference guide
40
LRMEQ+4BY1
Air-cooled refrigeration condensing unit
4P500362-1A – 2018.09
For the user
14
About the system
NOTICE
For future modifications or expansions of your system:
A full overview of allowable combinations (for future
system extensions) is available in technical engineering
data and should be consulted. Contact your installer to
receive more information and professional advice.
14.1
System layout
c
b
d
a
a
Outdoor unit (ZEAS condensing unit)
b
Refrigerant piping
c
Indoor unit (Blower coil)
d
Indoor unit (Showcase)
15
Before operation
WARNING
This unit contains electrical and hot parts.
WARNING
Before operating the unit, be sure the installation has been
carried out correctly by an installer.
NOTICE
Never inspect or service the unit by yourself. Ask a
qualified service person to perform this work.
CAUTION
It is not good for your health to expose your body to the air
flow for a long time.
CAUTION
To avoid oxygen deficiency, ventilate the room sufficiently
if equipment with burner is used together with the system.
CAUTION
Do NOT operate the system when using a room
fumigation-type insecticide. Chemicals could collect in the
unit, and endanger the health of people who are
hypersensitive to chemicals.
NOTICE
Be sure to turn on the power 6 hours before operation in
order to have power running to the crankcase heater and
to protect the compressor.
16
Operation
16.1
Operation range
Use the system in the following temperature ranges for safe and
effective operation.
LRMEQ*
LRLEQ*
Outdoor temperature
–20~43°C DB
Evaporating temperature
–20~5°C
–45~–20°C
16.2
Operating the system
16.2.1
About operating the system
▪ To start and stop operation of the outdoor unit, use the external
operation switch.
▪ If the main power supply is turned off during operation, operation
will restart automatically after the power turns back on again.
17
Energy saving and optimum
operation
▪ Turn off the main power supply switch to the unit when the unit is
NOT used for longer periods of time. If the main power supply
switch is on, the unit consumes electricity. Before restarting the
unit, turn on the main power supply switch 6 hours before
operation to ensure smooth running.
18
Maintenance and service
NOTICE
Never inspect or service the unit by yourself. Ask a
qualified service person to perform this work.
WARNING
Never replace a fuse with a fuse of a wrong ampere ratings
or other wires when a fuse blows out. Use of wire or
copper wire may cause the unit to break down or cause a
fire.
CAUTION
Do NOT insert fingers, rods or other objects into the air
inlet or outlet. Do NOT remove the fan guard. When the
fan is rotating at high speed, it will cause injury.
CAUTION: Pay attention to the fan!
It is dangerous to inspect the unit while the fan is running.
Be sure to turn off the main switch before executing any
maintenance task.
CAUTION
After a long use, check the unit stand and fitting for
damage. If damaged, the unit may fall and result in injury.
Содержание LRMEQ4BY1
Страница 44: ...4P500362 1A 2018 09 Copyright 2016 Daikin...