
14
|
About the box
Installer and user reference guide
43
FXMA-A
VRV system air conditioner
4P680920-1 – 2022.01
14 About the box
14.1 Overview: About the box
This chapter describes what you have to do after the box with the indoor unit is
delivered on-site.
It contains information about:
▪
Unpacking and handling the unit
▪
Removing the accessories from the unit
Keep the following in mind:
▪
At delivery, the unit MUST be checked for damage. Any damage MUST be
reported immediately to the claims agent of the carrier.
▪
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
▪
Prepare the path along which you want to bring the unit inside in advance.
14.2 Indoor unit
14.2.1 To unpack and handle the unit
Use a sling of soft material or protective plates together with a rope when lifting
the unit in order to avoid damage or scratches to the unit.
1
Lift the unit by holding on to the hanger brackets without exerting any
pressure on other parts, especially on refrigerant piping, drain piping and
other resin parts.
1
2
FXMA50~80
Содержание FXMA50A5VEB
Страница 86: ......
Страница 87: ......
Страница 88: ...4P680920 1 2022 01 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...