16
|
Unit installation
Installer and user reference guide
55
FXAA15~63AUV1B
VRV system air conditioner
4P622295-1A – 2020.10
B
(mm)
52
104
44
290
60
44
98
348
345
83
100
37.9
464.9
427.1
1050
b
c
c
d
e
d
e
f
g
h
a1
a1
a2
a2
i
A
Paper pattern for installation with mounting plate for FXAA15~32
B
Paper pattern for installation with mounting plate for FXAA40~63
a1
Recommended fixation location
a2
Recommended fixing spots
b
Pocket for the pipe port cover
c
Tabs for placing a spirit level
d
Through-the-wall hole Ø80 mm
e
Drain hose position
f
Position for the tape measure at symbol " "
g
Gas pipe end
h
Liquid pipe end
i
Temporary fixing hole
16.3.2 To drill a wall hole
CAUTION
For walls containing a metal frame or a metal board, use a wall embedded pipe and
wall cover in the feed-through hole to prevent possible heat, electrical shock, or fire.
NOTICE
Be sure to seal the gaps around the pipes with sealing material (field supply), in order
to prevent water leakage.
1
Drill a 80 mm large feed-through hole in the wall with a downward slope
towards the outside.
2
Insert a wall embedded pipe into the hole.
3
Insert a wall cover into the wall pipe.
Ø80
a b
c
a
Wall embedded pipe (field supply)
b
Putty (field supply)
c
Wall hole cover (field supply)
4
After completing wiring, refrigerant piping and drain piping, do NOT forget to
seal the gap with putty.
Содержание FXAA15AUV1B
Страница 86: ......
Страница 87: ......
Страница 88: ...4P622295 1A 2020 10 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...