
Outdoor Unit
SiBE01-829
84
Removal Procedure
2. Outdoor Unit
2.1
Removal of
Panels
and
Fan Motor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Features
Take care not to cut your
finger by the fins of the heat
exchanger.
The stop valve cover is
united with the shelter.
When reassembling, make
sure to fit the 5 hooks.
1
Loosen the screw of the
stop valve cover.
Pull down the stop
valve cover and remove
it.
DAIKIN
INVERTER
(R8529)
Handle
(R8528)
(R7188)
(R7189)
Содержание FTY25GXV1
Страница 1: ...SiBE01 829 Applied Models Non Inverter Pair Heat Pump SPLIT Pair Wall Mounted Type G Series ...
Страница 5: ...SiBE01 829 iv Table of Contents Index i Drawings Flow Charts iii ...
Страница 11: ...Introduction SiBE01 829 x ...
Страница 12: ...SiBE01 829 List of Function 1 Part 1 List of Function 1 Functions 2 ...
Страница 15: ...Functions SiBE01 829 4 List of Function ...
Страница 16: ...SiBE01 829 Specifications 5 Part 2 Specifications 1 Specifications 6 ...
Страница 19: ...Specifications SiBE01 829 8 Specifications ...
Страница 23: ...Printed Circuit Board Connector Wiring Diagram SiBE01 829 12 Printed Circuit Board Connector Wiring Diagram ...
Страница 49: ...Instructions SiBE01 829 38 Operation Manual ...
Страница 69: ...Check SiBE01 829 58 Service Diagnosis ...
Страница 107: ...Outdoor Unit SiBE01 829 96 Removal Procedure 10 Remove the electrical box Step Procedure Points R8556 ...
Страница 111: ...Outdoor Unit SiBE01 829 100 Removal Procedure ...
Страница 112: ...SiBE01 829 Others 101 Part 8 Others 1 Others 102 1 1 Trial Operation and Testing 102 1 2 Pump Down Operation 102 ...
Страница 119: ...Wiring Diagrams SiBE01 829 108 Appendix ...
Страница 123: ...SiBE01 829 iv Drawings Flow Charts ...