
SiBE01-829
Indoor Unit
Removal Procedure
65
1.4
Removal of
Horizontal
/
Vertical Blades
and
Safety Net
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1. Removing the horizontal
blade (large)
1
Open the horizontal
blade.
2
Unfasten the center
fixing shaft while
bending the horizontal
blade slightly.
Cautions on Mounting
The center fixing shaft can
be removed easily by
bending the blade.
Cautions on Mounting
1. Since key pattern hook is
provided, rotate the blades
and fit it to the right pivot
first.
2. Fit the blades to the center
and left pivots.
3
Unfasten the left fixing
shaft of the horizontal
blade.
4
Unfasten the right fixing
shaft of the horizontal
blade.
(R8580)
Horizontal blade
(R8581)
(R7993)
(R7995)
Key
Left
Right
Содержание FTY25GXV1
Страница 1: ...SiBE01 829 Applied Models Non Inverter Pair Heat Pump SPLIT Pair Wall Mounted Type G Series ...
Страница 5: ...SiBE01 829 iv Table of Contents Index i Drawings Flow Charts iii ...
Страница 11: ...Introduction SiBE01 829 x ...
Страница 12: ...SiBE01 829 List of Function 1 Part 1 List of Function 1 Functions 2 ...
Страница 15: ...Functions SiBE01 829 4 List of Function ...
Страница 16: ...SiBE01 829 Specifications 5 Part 2 Specifications 1 Specifications 6 ...
Страница 19: ...Specifications SiBE01 829 8 Specifications ...
Страница 23: ...Printed Circuit Board Connector Wiring Diagram SiBE01 829 12 Printed Circuit Board Connector Wiring Diagram ...
Страница 49: ...Instructions SiBE01 829 38 Operation Manual ...
Страница 69: ...Check SiBE01 829 58 Service Diagnosis ...
Страница 107: ...Outdoor Unit SiBE01 829 96 Removal Procedure 10 Remove the electrical box Step Procedure Points R8556 ...
Страница 111: ...Outdoor Unit SiBE01 829 100 Removal Procedure ...
Страница 112: ...SiBE01 829 Others 101 Part 8 Others 1 Others 102 1 1 Trial Operation and Testing 102 1 2 Pump Down Operation 102 ...
Страница 119: ...Wiring Diagrams SiBE01 829 108 Appendix ...
Страница 123: ...SiBE01 829 iv Drawings Flow Charts ...