Pump Down Operation
SiUS091133
383
Trial Operation and Field Settings
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing the unit.
Detail
1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 384 for forced cooling operation.
09/12/15/18 class
24/30/36 class
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R13628)
Hexagonal
wrench
Hexagonal
wrench
(R14474)
Service port
Gas stop valve
Liquid stop valve
Valve cap
Close
Содержание FTXS30LVJU
Страница 8: ...SiUS091133 Table of Contents vii...
Страница 11: ...SiUS091133 1 List of Functions Part 1 List of Functions 1 Functions 2 1 1 FTXS Series 2 1 2 FDXS Series 4...
Страница 15: ...SiUS091133 5 Specifications Part 2 Specifications 1 Specifications 6 1 1 FTXS Series 6 1 2 FDXS Series 11...
Страница 164: ...SiUS091133 Check Service Diagnosis 154 15 18 class 24 30 36 class Power module R16697 R16073 Power module...
Страница 259: ...Indoor Unit FTXS30 36LVJU SiUS091133 249 Removal Procedure 6 Disconnect the connector Step Procedure Points R9558...
Страница 413: ...Wiring Diagrams SiUS091133 403 Appendix...