Daikin FTXP20N5V1B Скачать руководство пользователя страница 8

5 Unit installation

Installation manual

8

FTXP20~3 ATXP20~35N5V1B

Daikin room air conditioner

3P650253-9H – 2022.10

5.2.2

To re-install the front panel

1

Attach the front panel. Align the shafts with the slots and push
them all the way in.

2

Close  the  front  panel  slowly;  press  at  both  sides  and  at  the
centre.

5.2.3

To remove the front grille

CAUTION

Wear  adequate  personal  protective  equipment  (protective
gloves,  safety  glasses,…)  when  installing,  maintaining  or
servicing the system.

1

Remove the front panel to remove the air filter.

2

Remove 2 screws (class 20~35) or 3 screws (class 50~71) from
the front grille.

3

Push  down  the  3  upper  hooks  marked  with  a  symbol  with  3
circles.

a

b

a

a

Upper hook

b

Symbol with 3 circles

4

We  recommend  opening  the  flap  before  removing  the  front
grille.

5

Place both hands under the centre of the front grille, push it up
and then toward you.

1

2

5.2.4

To re-install the front grille

1

Install the front grille and firmly engage the 3 upper hooks.

2

Install 2 screws back on the front grille.

3

Install the air filter and then mount the front panel.

5.2.5

To remove the electrical wiring box cover

1

Remove the front grille.

2

Remove 1 screw from the electrical wiring box.

3

Open  the  electrical  wiring  box  cover  by  pulling  the  protruding
part on the top of the cover.

4

Unhook the tab on the bottom and remove the electrical wiring
box cover.

a

a

c

b

a

1

3

2

a

Tab

b

Protruding part on the top of the cover

c

Screw

5.2.6

To open the service cover

1

Remove 1 screw from the service cover.

2

Pull out the service cover horizontally away from the unit.

a

b

a

Service cover screw

b

Service cover

5.3

Mounting the indoor unit

5.3.1

To install the mounting plate

1

Install the mounting plate temporarily.

2

Level the mounting plate.

3

Mark  the  centres  of  the  drilling  points  on  the  wall  using  a  tape
measure. Position the end of tape measure at symbol " ".

4

Finish the installation by securing the mounting plate on the wall
using M4×25L screws (field supply).

INFORMATION

The removed pipe port cover can be kept in the mounting
plate pocket.

337

770

A

285

44.5

170

48

48

44.5

116.5

117

337

50

213

237

170

A

d

e

(mm)

a

a

f

h g

a

a

b

a

c

a c

a

d

e

A

A

Mounting plate for class 20~35

a

Recommended mounting plate fixing spots

b

Pocket for the pipe port cover

c

Tabs for placing a spirit level

Содержание FTXP20N5V1B

Страница 1: ...Installation manual Daikin room air conditioner English Installation manual Daikin room air conditioner FTXP20N5V1B FTXP25N5V1B FTXP35N5V1B ATXP20N5V1B ATXP25N5V1B ATXP35N5V1B...

Страница 2: ...s instrukcij atbilst d m direkt v m vai regul m ja vien ie izstr d jumi tiek lietoti saska ar m su instrukcij m s v zhode s nasleduj cou imi smernicou ami alebo predpisom mi za predpokladu e sa v robk...

Страница 3: ...7 1206 Radio Equipment Regulations 2017 following the provisions of BS EN 60335 2 40 2003 A13 2012 BS EN IEC 62311 2020 BS EN IEC 55014 1 2021 BS EN IEC 55014 2 2021 BS EN IEC 61000 3 2 2019 A1 2021 B...

Страница 4: ...fferent channel of the indoor unit infrared signal receiver 13 10 Commissioning 14 10 1 Checklist before commissioning 14 10 2 To perform a test run 14 10 2 1 To perform a test run in winter season 14...

Страница 5: ...ill be sucked in This will cause abnormal pressure in the refrigeration cycle which may result in equipment damage and even injury CAUTION Incomplete flaring may cause refrigerant gas leakage Do NOT r...

Страница 6: ...DANGER RISK OF ELECTROCUTION Disconnect the power supply for more than 10 minutes and measure the voltage at the terminals of main circuit capacitors or electrical components before servicing The vol...

Страница 7: ...fety precaution 5 1 1 Installation site requirements of the indoor unit INFORMATION The sound pressure level is less than 70 dBA Air flow Make sure nothing blocks the air flow Drainage Make sure conde...

Страница 8: ...then mount the front panel 5 2 5 To remove the electrical wiring box cover 1 Remove the front grille 2 Remove 1 screw from the electrical wiring box 3 Open the electrical wiring box cover by pulling t...

Страница 9: ...ppers to remove the pipe port cover as this would damage the front grille 5 3 4 To provide drainage Make sure condensation water can be evacuated properly This involves General guidelines Connecting t...

Страница 10: ...left side and do not forget to tighten it with the fixing screw otherwise water leakage may occur a b a b a Insulation fixing screw b Drain hose 4 Attach the drain hose to the refrigerant piping bott...

Страница 11: ...it using flare connections 2 Insulate the refrigerant piping interconnection cable and drain hose on the indoor unit as follows c a b f d g e a Gas pipe b Gas pipe insulation c Interconnection cable d...

Страница 12: ...cable for 220 240 V Recommended field fuse 20 A Earth leakage circuit breaker Must comply with applicable legislation 7 2 To connect the electrical wiring to the indoor unit WARNING Provide adequate m...

Страница 13: ...the bottom frame or the front grille 2 Pass the drain hose and refrigerant piping through the wall hole and seal the gap with a putty 8 3 To fix the unit on the mounting plate 1 Set the indoor unit on...

Страница 14: ...e refrigerant pipes gas and liquid are thermally insulated Drainage Make sure drainage flows smoothly Possible consequence Condensate water might drip The system is properly earthed and the earth term...

Страница 15: ...operation press INFORMATION Some of the functions CANNOT be used in the test run operation mode If a power failure occurs during operation the system automatically restarts immediately after power is...

Страница 16: ...AC CN E HA HE HL HN HR MR _A MR _B S U V W X A K R_ NE Connection connector D V D Diode DB Diode bridge DS DIP switch E H Heater FU F U for characteristics refer to PCB inside your unit Fuse FG Conne...

Страница 17: ...FTXP20 35N5V1B ATXP20 35N5V1B Daikin room air conditioner 3P650253 9H 2022 10 Symbol Meaning X Terminal X M Terminal strip block Y E Electronic expansion valve coil Y R Y S Reversing solenoid valve c...

Страница 18: ......

Страница 19: ......

Страница 20: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P650253 9H 2022 10 Copyright 20...

Отзывы: