10 Commissioning
Installation Manual
13
FTXF20~42C5V1B
Daikin room air conditioners
3P519299-9X – 2020.12
ON/OFF
a
b
a
Operation lamp
b
Indoor unit ON/OFF switch
8
Press the indoor unit ON/OFF switch while the operation lamp
is blinking.
Jumper
Address
Factory setting
1
After cutting with nippers
2
INFORMATION
If the setting could NOT be completed while the operation
lamp was blinking, repeat the setting process from the
beginning.
9
When the setting is complete, press:
Model
Button
FTXF, CTXF, ATXF
Result:
The user interface will return to the previous screen.
10
Commissioning
NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
10.1
Checklist before commissioning
After the installation of the unit, first check the items listed below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.
You read the complete installation instructions, as
described in the
installer reference guide
.
The
indoor units
are properly mounted.
The
outdoor unit
is properly mounted.
Air inlet/outlet
Check that the air inlet and outlet of the unit is NOT
obstructed by paper sheets, cardboard, or any other
material.
There are NO
missing phases
or
reversed phases
.
The
refrigerant pipes
(gas and liquid) are thermally
insulated.
Drainage
Make sure drainage flows smoothly.
Possible consequence:
Condensate water might drip.
The system is properly
earthed
and the earth terminals
are tightened.
The
fuses
or locally installed protection devices are
installed according to this document, and have NOT been
bypassed.
The
power supply voltage
matches the voltage on the
identification label of the unit.
The specified wires are used for the
interconnection
cable
.
The indoor unit receives the signals of the
user interface
.
There are NO
loose connections
or damaged electrical
components in the switch box.
The
insulation resistance
of the compressor is OK.
There are NO
damaged components
or
squeezed
pipes
on the inside of the indoor and outdoor units.
There are NO
refrigerant leaks
.
The correct pipe size is installed and the
pipes
are
properly insulated.
The
stop valves
(gas and liquid) on the outdoor unit are
fully open.
10.2
Checklist during commissioning
The order mentioned in following commissioning checklist MUST be
followed.
The
minimum flow rate
is guaranteed in all conditions.
See "To check the water volume and flow rate" in
Preparing water piping.
To perform an
air purge
.
To perform a
test run when the hybrid is in heating
mode
.
To perform an
actuator test run
.
Underfloor screed dryout function
The underfloor screed dryout function is started (if
necessary).
To perform a gas pressure test.
To perform a test run on the
gas boiler
.
To perform a test run on the
airconditioning DX unit in
cooling mode.
10.3
To perform a test run
Prerequisite:
Power supply MUST be in the specified range.
Prerequisite:
Test run may be performed in cooling or heating
mode.
Prerequisite:
Test run should be performed in accordance with the
operation manual of the indoor unit to make sure that all functions
and parts are working properly.
1
In cooling mode, select the lowest programmable temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.
2
When the test run is finished, set the temperature to a normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.
3
The system stops operating 3 minutes after the unit is turned
OFF.