Main Functions
SiENBE12-713
64
Function and Control
1.3
Operation Starting Control
FTXG25-35E, CTXG50E
The system carries out the following control at the beginning to conduct every functional parts
properly.
1. Opening the front panel fully
2. Output of the
Δ
D signal after the front panel starts moving
3. Opening the flap fully after the front panel opens fully
4. Making the fan rotate when the flap passes over the fan-banned area
Control Flow
Timing Chart
1
Opening the front p
a
nel f
u
lly
S
t
a
rt
R
u
nning
2
O
u
tp
u
t of the
D
D
s
ign
a
l
a
fter
the front p
a
nel
s
t
a
rt
s
moving
4
M
a
king the f
a
n rot
a
te
when the fl
a
p p
ass
e
s
over
the f
a
n-
ba
nned
a
re
a
3
Opening the fl
a
p f
u
lly
(R
33
11)
TDELTA
F
u
lly clo
s
e
OFF
S
t
a
rt
ON
Fl
a
p
Under r
u
nning control
Under r
u
nning control
Under oper
a
tion mode control
Under oper
a
tion mode control
Lo
u
ver
s
F
a
n
D
D
F
u
lly open
F
u
lly open
F
u
lly clo
s
e
Right
Left
ON
OFF
OFF
O
u
tp
u
t
ON
D
0
F
a
n-
ba
nned
a
re
a
(R
33
12)
Front
p
a
nel
Force
su
pply
(from the
o
u
tdoor
u
nit)
The o
u
tdoor
u
nit provide
s
force
when it receive
s
the
D
D
s
ign
a
l.
Oper
a
tion
s
t
a
rting control
Содержание FTKS20D3VMW
Страница 11: ...Introduction SiENBE12 713 x...
Страница 47: ...Specifications SiENBE12 713 36 Specifications...
Страница 113: ...Control Specification SiENBE12 713 102 Function and Control...
Страница 122: ...SiENBE12 713 Instruction System Configuration 111 Names of Parts FTK X S 20 25 35 C Indoor Unit...
Страница 235: ...Instruction SiENBE12 713 224 System Configuration...
Страница 297: ...Check SiENBE12 713 286 Service Diagnosis...
Страница 316: ...SiENBE12 713 Outdoor Unit Removal Procedure 305 Step Procedure Points...
Страница 330: ...SiENBE12 713 Others 319 Part 8 Others 1 Others 320 1 1 Test Run from the Remote Control 320 1 2 Jumper Settings 321...