Daikin FLOSTO150 Скачать руководство пользователя страница 18

Inspection and maintenance

Installation and operating instructions

18

Daikin FLOSTO150

Hot water storage tank

008.1632099_00 – 03/2019 – EN

8

Inspection and maintenance

Regular inspection of the hot water storage tank guarantees a long
service life and fault-free operation.

An external current anode is only necessary if the filling water is very
hard and contains chloride (>/= 250 mg/l). Please contact your local
water supply company for further information.

DANGER: RISK OF ELECTROCUTION

Touching live parts can result in an electric shock and lead
to potentially fatal injuries and burns.

▪ If there is an electric immersion heater or an external

current anode installed in the hot water storage tank,
these components must be isolated from the power sup-
ply before starting work (e.g. fuse, main switch switched
off and secured against inadvertent switching on again).

DANGER: RISK OF ELECTROCUTION

All work performed on live components must be carried out
in accordance with the proper procedures, otherwise there
may be a danger to the life and health of personnel and the
function may be impaired.

▪ Rectification of damage to live components may only be

carried out by heating specialists authorised and recog-
nised by the energy supply company.

8.1

Annual inspection

If present:

▪ Carry out a functional inspection of the electric immersion heater

by checking the temperature display and the switching states in
the individual operating modes:

▪ Electric immersion heater: See the associated installation and

operating instructions.

▪ Visual inspection of the general condition of the hot water storage

tank.

▪ Visual check of connections and pipes. In the event of damage,

determine the cause.

1

Replace defective parts.

Check all electrical components, connections and cables.

2

Repair damaged parts or replace them.

Check the water pressure of the cold water supply (<6 bar)

3

and, if necessary, the fitting or setting of the pressure reducer.

8.2

Cleaning

INFORMATION

It is recommended that the stainless steel accumulator is
cleaned by a specialist every two years at the latest.

INFORMATION

Before opening the inspection opening, close the cold wa-
ter line valve and empty the tank.

1

Remove the device front panel and housing cover.

Fig. 8-1

Removing the thermal insulation

2

Remove the thermal insulation from the inspection opening.

Fig. 8-2

Remove the M8 nut

3

Loosen the M8 nut of the mounting bracket. Leave the M8 nut on
the threaded bolt.

Fig. 8-3

Removing the lid

4

Loosen the mounting bracket and push the cover into the tank
until it moves freely.

Содержание FLOSTO150

Страница 1: ...Installation and operating instructions Hot water storage tank English Installation and operating instructions FLOSTO150 03 2019...

Страница 2: ......

Страница 3: ...sion heater 9 3 2 2 Circulation brakes 9 3 2 3 Scalding protection 9 3 2 4 Circulation line connection 9 3 2 5 External current anode 9 3 2 6 Storage tank connection kit 9 4 Set up and installation 10...

Страница 4: ...t by children without supervision Make up the power supply in accord ance with IEC 60335 1 via a separ ator device which exhibits contact separation in all poles with a contact opening distance that p...

Страница 5: ...rform the respective activity and who have participated in advanced training courses re cognised by the relevant competent authority These in clude in particular certified heating engineers quali fied...

Страница 6: ...culated as calcium carbonate 3 mmol l Conductivity 1500 ideal 100 S cm Chloride 250 mg l Sulphate 250 mg l pH value heating water 6 5 8 5 Measures for desalination softening or hardness stabilisation...

Страница 7: ...s and operating manual to the operator and point out that these documents must be made available at all times and must be stored in the immediate vicinity of the device Document the handover by fillin...

Страница 8: ...tion Installation and operating instructions 8 Daikin FLOSTO150 Hot water storage tank 008 1632099_00 03 2019 EN 3 Product description 3 1 Design and components Fig 3 1 View from front Fig 3 2 View fr...

Страница 9: ...n brakes To prevent heat loss from the connection pipes when the circulation pump is switched off and during periods when no domestic water is drawn off gravity circulation circulation brakes ZKB set...

Страница 10: ...device If there are any questions please contact our Technical Customer Service 4 1 2 Scope of delivery E F Fig 4 1 Scope of delivery Item Designation A Storage tank cladding side panel B Storage tan...

Страница 11: ...FLOSTO150 Hot water storage tank 008 1632099_00 03 2019 EN Fig 4 3 Installing the hot water storage tank 4 1 4 Mounting removing the storage tank cladding Mounting the storage tank cladding Fig 4 4 In...

Страница 12: ...ccur when legionella protection is active or when the hot water target temperature is set to 60 C Fit scalding protection see Chap 3 2 3 For domestic water pipes observe the stipulations of EN 806 and...

Страница 13: ...loss Install the heat insulation in accordance with country specific guidelines The manufacturer recommends an insulation thickness of at least 20 mm 4 3 Filling Topping Up INFORMATION Any optional ac...

Страница 14: ...is an electric immersion heater set the required storage water temperature Switch on the mains supply switch on the heat generator Wait for the start phase Only if all points on the checklist can be a...

Страница 15: ...Open all water outlets 3 Connect the drain hose to the combined filling and draining valve of the storage tank 4 Open the combined filling and draining valve Fig 6 1 Draining the storage tank 6 2 1 D...

Страница 16: ...ment H 1 H 2 H m Heating circuits MAG Diaphragm expansion vessel MIX 3 way mixer with drive motor MK1 Mixer group with high efficiency pump MK2 Mixer group with high efficiency pump PWM regu lated P K...

Страница 17: ...ter storage tank 008 1632099_00 03 2019 EN PK SV MAG A2 F Flosto tV1 tR MIX H2 PMI tMI tAU M RoCon M1 H1 MK1 MK2 DHW VS tDHW DS SV CW F B n o C o R M A B AB 3UV DHW 3UVB1 FLS M B A AB tV2 Fig 7 2 Conn...

Страница 18: ...ating specialists authorised and recog nised by the energy supply company 8 1 Annual inspection If present Carry out a functional inspection of the electric immersion heater by checking the temperatur...

Страница 19: ...from the tank with the narrow side ahead Make sure that no parts can fall into the tank If necessary secure the lid with a cord Fig 8 4 Checking and cleaning the interior of the storage tank 6 Check a...

Страница 20: ...tinuous output QD according to DIN 4708 kW 49 Maximum draw off rate for the duration of 10 min on recharging at xx kW TkW 10 C TWW 40 C TSP 60 C l min 20 1 Hot water volume without reheating at a draw...

Страница 21: ...illibars m l h Flow rate in litres per hour m l min Flow rate in litres per minute Storage tank charging heat exchanger 1 9 3 Tightening torques Designation Thread size Tightening torque Hydraulic lin...

Страница 22: ...10 Notes Installation and operating instructions 22 Daikin FLOSTO150 Hot water storage tank 008 1632099_00 03 2019 EN 10 Notes...

Страница 23: ...osal 15 Domestic water pipes 12 Draining the heating circuit 15 E Electric immersion heater 9 14 Electrical installation 6 External current anode 9 I Inspection 18 Installing the hot water storage tan...

Страница 24: ...008 1632099_00 03 2019 EN Copyright Daikin...

Отзывы: