Copy from pCO² to the Software Key
■
Switch off the pCO
2
and remove the "expansion memory" cover with a screwdriver (see Fig. 1)
■
Set the key selector on
■
Insert the key in the corresponding pin connector as shown. (see Fig. 2)
■
Press simultaneously the buttons UP an DOWN then supply the pCO
2
■
Check the LED on the key is on (green color
)
■
Wait until the request of copying appears on the LCD display, then release the buttons and confirm
by pressing ENTER.
■
If the application includes a password to protect the software, use the UP and DOWN buttons on
the terminal to enter the correct password. Then press enter.
■
The data transfer operation takes about 50s using the 1MB key and 100s using the 2MB one.the
display will show a progressive series of numbers.
■
Once copied the application program starts, then switch off the pCO
2
, remove the key, put the
cover in its place and switch on the pCO
2
again,
■
Now the key has the program transferred by the pCO
2
.
Fig. 1
Fig. 2
ESIE07-05.book Page 5 Friday, December 21, 2007 3:21 PM
Содержание EWWQ-AJYNN
Страница 3: ...ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...
Страница 13: ...ESIE07 05 2 2 Part 2 Functional Description 3 1 2 5 ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...
Страница 88: ...ESIE07 05 3 2 Part 3 Troubleshooting 3 1 3 5 ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...
Страница 112: ...ESIE07 05 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...
Страница 114: ...ESIE07 05 5 2 Part 5 Maintenance 3 1 5 ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...