Daikin EWWD120MBYNN Скачать руководство пользователя страница 10

Installation manual

7

EWWD120~540MBYNN

Packaged water-cooled water chillers

4PW22684-1A

B

EFORE

 

STARTING

 

I do confirm having executed and checked all the above
mentioned items.

Date

Sign

K

EEP

 

FOR

 

FUTURE

 

REFERENCE

C

USTOMIZATION

 

IN

 

THE

 

SERVICE

 

MENU

To change a setting in the service menu:

1

Enter the usersettings menu as indicated in the operation
manual and press the 

h

 key to go to the last screen to enter the

service menu (this is only possible if the unit is off).

2

Enter the correct password using the 

h

  and 

g

  keys. The

password can be found in the service manual.

3

Press 

q

 to confirm the password and enter the service menu.

4

Go to the screen which contains the parameter to be modified by
using the 

h

 and 

g

 keys.

5

Position the cursor behind the parameter to be modified using
the 

q

 key.

6

Select the appropriate setting using the 

h

 and 

g

 keys.

7

Press 

q

 to confirm the modification. When the modification has

been confirmed, the cursor switches to the next parameter
which can now be configured.

8

Place the cursor in the top left corner of the screen when you
are finished changing the parameters on this screen.

9

Repeat from instruction 4 onwards to modify other parameters.

Setting of the minimum outlet water temperature

It is possible to change the minimum outlet water temperature
(

) in the service menu. Before lowering the minimum

outlet water temperature:

Make sure that sufficient glycol is added to the water system
according to the table. 

Make sure that the low pressure safety is lowered according to
the table.

Defining a unit in a setup of a DICN system

Change the setting of 

 

 to 

 on each unit.

Setting the password for safety reset

To avoid resetting of safeties by unqualified persons, the user pass-
word is asked by default when resetting a sefety.

This password however can be changed to 

  

 or to

.

Setting of compressor running hours

When the displayed running hours do not comply with the actual
running hours of the compressor it is possible to change the running
hours to comply.

The unit should not be started, not even for a very short
period of time, before the following pre-commissioning
checklist is filled out completely.

tick 

when 
checked

standard steps to go through before
starting the unit

1

Check for external damage

2

Open all shut-off valves indicated by a red label: "OPEN THIS 
VALVE BEFORE OPERATION". (Open the liquid line, dis-
charge and suction (if provided) stop valves completely.)

3

Install mainfuses, earth leak detector and  mainswitch.

Recommended fuses: aM according to IEC standard 269-2.

Refer to the wiring diagram for size.

4

Supply the main voltage and check if it is within the allowable 
±10% limits of the nameplate rating.

The electrical main power supply should be arranged so, that 
it can be switched on or off independently of the electrical 
supply to other items of the plant and equipment in general.

Refer to the wiring diagram, terminals L1, L2 and L3.

5

Supply water to the evaporator and verify if waterflow is within 
the limits as given in the table under "Water charge, flow and 
quality" on page 4.

6

The piping must be completely purgedSee also chapter "Pre-
paring, checking and connecting the water circuit" on page 3.

7

Connect the pump contact(s) in series with the contact of the 
flowswitch(es), so that the unit can only come in operation 
when the waterpumps are running and the water flow is 
sufficient.

For DICN configurations, every chiller shall have its own 
flowswitch and shall be interlocked with the pump from which it 
gets the flow.

8

Check the oil level in the compressors.

9

Install the filter kit(s) supplied with the unit in front of the 
evaporator(s) water inlet.

10

Check that all the water sensors are correctly fixed into the 
heat exchanger (see also the sticker attached to the heat 
exchanger).

NOTE

It is necessary to read the operation manual
delivered with the unit before operating the unit. It
will contribute to understand the operation of the
unit and its electronic controller.

Close all switch box doors after installation of the
unit.

All customized settings must be done by a licensed
technician.

minimum outlet water (

)

2°C

0°C

–5°C

–10°C

Weight of ethylene glycol

(%)

10

20

30

40

Weight of propylene glycol (%)

15

25

35

40

Low pressure setting

(bar)

0.8

0.6

0.2

0.2

Improper setting of the minimum outlet water temperature
can result in severe damage of the equipment.

NOTE

Since inadequate resetting of safeties can damage the
machine, it is advised to keep the default setting of

  

.

Содержание EWWD120MBYNN

Страница 1: ...INSTALLATION MANUAL EWWD120MBYNN EWWD180MBYNN EWWD240MBYNN EWWD280MBYNN EWWD360MBYNN EWWD440MBYNN EWWD500MBYNN EWWD520MBYNN EWWD540MBYNN Packaged water cooled water chillers...

Страница 2: ...3 24 V K2P M2P L2 L3 SLAVE 1 F18 K2P F8 F9 74 75 76 77 78 79 N L1 F10 F19 230 V 73 24 V K1P M1P L2 L3 MASTER F20 S1S S6S M K1P F11 F12 74 75 76 77 78 79 S10S M M3P SLAVE 2 M2P SLAVE 1 M1P MASTER R8T L...

Страница 3: ...es 04 Richtlijnen zoals geamendeerd 05 Directivas seg n lo enmendado 06 Direttive come da modifica 07 v 08 Directivas conforme altera o em 09 10 Direktiver med senere ndringer 11 Direktiv med f retag...

Страница 4: ...10 C Daikin Integrated Chiller Network DICN Liquid line solenoid valve Sight glass with moisture indication Voltage free contacts general operation pumpcontact alarm operation circuit 1 operation circ...

Страница 5: ...enerated by the unit does not disturb anyone 5 Ensure that water cannot cause any damage to the location in case it drips out of the unit INSPECTING AND HANDLING THE UNIT At delivery the unit should b...

Страница 6: ...d couplings to the evaporator inlet s Connecting the water outlet pipe containing the outlet water tem perature sensor not for EWWD120 The water outlet pipe containing the outlet water temperature sen...

Страница 7: ...isted in the table below The filter kit supplied with the unit must be installed in front of the evaporator water inlet by means of the supplied couplings as shown in the figure The filter has holes o...

Страница 8: ...ltage free contacts to indicate the status of the unit These voltage free contacts can be wired as described on the wiring diagram The maximum allowable current is 4 A Remote inputs Besides the voltag...

Страница 9: ...s EWWD360 540 Specifications of the cable 6 ray telephone cable with a maximum cable resistance of 0 1 m 2 For units in a DICN configuration the digital controllers of the units can be installed remot...

Страница 10: ...ist is filled out completely tick when checked standard steps to go through before starting the unit 1 Check for external damage 2 Open all shut off valves indicated by a red label OPEN THIS VALVE BEF...

Страница 11: ...certain measured temperatures inlet water evaporator temperature and mixed outlet water evaporator temperature This in order to correct a possible measurement fault The default value of the probe off...

Страница 12: ...all units the pump runs for a time indicated by the setting Slave 3 S3 is configured to operate when its remote start stop switch S6S S3 is pushed by the operator Slave 1 S1 slave 2 S2 and the master...

Страница 13: ...shows the system configuration field wiring and terminals for field wiring of this example Purpose Purpose of this system is to keep a buffer at a constant temperature and to feed a load from this bu...

Страница 14: ...Installation manual 11 EWWD120 540MBYNN Packaged water cooled water chillers 4PW22684 1A NOTES...

Страница 15: ...circuit The operation of the water chiller is then controlled by the Digital Display Controller Shut down by switching off the controller and the circuit breaker of the power circuit WARNINGS Emergen...

Страница 16: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW22684 1A...

Отзывы: