Pre-Test Run Checks
ESIE-0303
4–12
Part 4 – Commissioning and Test Run
3
1
4
5
1.7
Setting of the Flow Switch
Functional
description
The flow switch protects the evaporator against freezing. It shuts down the unit when the flow of the
unit becomes lower than the minimum allowable flow of the unit.
For units with leaving water applications lower than 5°C, the setting has to be done after installation.
This is because the set point of the flow switch is influenced by the type and concentration of
anti-freeze in the water.
Necessary parts
The following parts are necessary in the water system to be able to do a correct setting of the flow
switch (included in P&B-models).
■
Pump
■
Pressure ports before and after pump
■
Water flow regulating valve.
Flow switch
The illustration below shows the flow switch.
Components
The table below list the main components of the flow switch for regulation.
Flow values
The table below contains the values for the flowswitch at 20°C ambient temperature and 20°C water
temperature.
1
2
No.
Component
Details
1
6 LEDs for visual flow indication
■
4 green LEDs: degree of set point overrange
(1, 2, 3, 4 green LEDs lit)
■
1 yellow LED: set point reached/overrange
■
1 red LED: set point underrange.
2
Potentiometer
Remove protective screw cap to reach
potentiometer.
Unit
Value
Lower
Upper
EUW(L)5KZ
20 l/min
-0 l/min
+2 l/min
EUW(L)8KZ
33 l/min
-0 l/min
+2 l/min
EUW(L)10KZ
43 l/min
-0 l/min
+4 l/min
EUW(L)12KZ
51 l/min
-0 l/min
+6 l/min
EUW(L)16KZ
66 l/min
-0 l/min
+4 l/min
EUW(L)20KZ
86 l/min
-0 l/min
+8 l/min
EUW(L)24KZ
102 l/min
-0 l/min
+12 l/min
Содержание EUWL KZW1 Series
Страница 1: ......
Страница 2: ......
Страница 8: ...Introduction ESIE 0303 vi 3 1 4 5 ...
Страница 10: ...ESIE 0303 1 2 Part 1 System Outline 3 1 1 5 ...
Страница 50: ...Piping Layout ESIE 0303 1 42 Part 1 System Outline 3 1 1 4 5 ...
Страница 60: ...Wiring Layout ESIE 0303 1 52 Part 1 System Outline 3 1 1 4 5 ...
Страница 61: ...ESIE 0302 Wiring Layout Part 1 System Outline 1 53 3 6 Wiring Diagram Wiring diagram ...
Страница 62: ...Wiring Layout ESIE 0302 1 54 Part 1 System Outline ...
Страница 64: ...ESIE 0303 2 2 Part 2 Functional Description 3 1 2 5 ...
Страница 82: ...The Digital Controller EUW5 24KZW1 and EUWL5 24KZW1 ESIE 0303 2 20 Part 2 Functional Description 3 1 2 4 5 ...
Страница 84: ...ESIE 0303 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Страница 87: ...ESIE 0303 Inputs and Outputs Overview Part 3 Troubleshooting 3 5 3 3 4 5 1 ...
Страница 88: ...Inputs and Outputs Overview ESIE 0303 3 6 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 94: ...Malfunction Indications and Safeties Overview ESIE 0303 3 12 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 100: ...Checking the Inputs and Outputs ESIE 0303 3 18 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 112: ...Troubleshooting ESIE 0303 3 30 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 114: ...ESIE 0303 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Страница 130: ...ESIE 0303 5 2 Part 5 Maintenance 3 1 5 ...
Страница 139: ...ESIE 0303 Index 3 3 4 5 1 Wiring Diagram k 1 53 ...
Страница 140: ...ESIE 0303 4 Index 3 1 4 5 ...