ESIE11-02
Pre-Test Run Checks
Part 4 – Commissioning and Test Run
4–23
3
4
5
1
1.12
Control of the function of the 4-way valve for EUWY*5-24KBZW1
Illustration
The illustration below shows the main components of the 4-way valve and of the connections with the
4-way valve.
Components
The table below lists the main components of the 4-way valve and of the connections with the 4-way
valve.
Normal cooling
The table below contains the normal condition of the 4-way valve in cooling mode.
5
1
6
4
2
3
a
b
e
d
f
c
Symbol
Description
Symbol
Description
1
Discharge tube from the
compressor
a
Pilot body
2
Suction tube to the compressor
b
Coil
3
Tube to the plate heat exchanger
c
Piston body
4
Tube to the air-cooled heat
exchanger
d
Compressor
5
Left pilot back capillary tube
e
Piston needle
6
Right pilot back capillary tube
f
Bleed hole
Discharge
tube 1
Suction
tube 2
Tube to the
plate heat
exchanger
Tube to the
air-cooled
heat
exchanger
Left pilot
back capil-
lary tube
Right pilot
back capil-
lary tube
Hot
Cool
Cool as in
column 2
Hot as in
column 1
Temperature
of valve body
Temperature
of valve body
Содержание EUWAB10KBZW1
Страница 2: ......
Страница 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Страница 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Страница 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Страница 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Страница 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Страница 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Страница 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Страница 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Страница 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Страница 210: ...ESIE11 02 4 Index 3 1 4 5...