Daikin ERQ200A7W1B Скачать руководство пользователя страница 15

ERQ125~250A7W1B

Inverter condensing unit

4PW51323-1D – 2022.10

Installation manual

13

11.2.

Precautions when adding R410A

Be sure to charge the specified amount of refrigerant in liquid state to
the liquid pipe.
Since this refrigerant is a mixed refrigerant, adding it in gas form may
cause the refrigerant composition to change, preventing normal
operation.

Before charging, check whether the refrigerant cylinder is
equipped with a siphon tube or not.

Be sure to use tools exclusively for R410A to ensure required
pressure resistance and to prevent foreign materials from mixing
into the system.

11.3.

Stop valve operation procedure

Size of stop valve

The sizes of the stop valves connected to the system are as listed in
the table below.

Opening stop valve 

(See figure 23)

1.

Remove the cap and turn the valve counterclockwise with the
hexagon wrench.

2.

Turn it until the shaft stops.

3.

Make sure to tighten the cap securely. Refer to the table below

Closing stop valve 

(See figure 23)

1.

Remove the cap and turn the valve clockwise with the hexagon
wrench.

2.

Securely tighten the valve until the shaft contacts the main body
seal.

3.

Make sure to tighten the cap securely.
For the tightening torque, refer to the table above.

11.4.

Additional refrigerant charge

Follow the procedures below.

CAUTION

In Europe, the 

Greenhouse gas emissions

 of the total

refrigerant charge in the system (expressed as tonnes CO

2

equivalent) is used to determine the maintenance intervals.
Follow the applicable legislation.

Formula to calculate the greenhouse gas emissions:

GWP value of the refrigerant × Total refrigerant charge [in
kg]/1000

Charge the liquid 
refrigerant with the 
cylinder in upright 
position.

Charge the liquid 
refrigerant with the 
cylinder in up-side-down 
position.

Charging with an unsuitable substance may cause
explosions and accidents, so always make sure that the
appropriate refrigerant (R410A) is charged.
Refrigerant containers must be opened slowly.

Do not open the stop valve until all piping and
electrical steps of 

"10. Checking of unit and

installation conditions" on page 12

 are completed. If

the stop valve is left open without turning on the
power, it may cause refrigerant to build up in the
compressor, leading to insulation degradation.

Always use a charge hose for service port connection.

After tightening the cap, check that no refrigerant
leaks are present.

ERQ125

ERQ200

ERQ250

Liquid line stop valve

Ø9.5

Gas line stop valve

Ø15.9

Ø19.1

Ø25.4

(a)

(a) The model ERQ250 supports field piping of Ø22.2 on the accessory pipe 

supplied with the unit.

1

Service port

2

Cap

3

Hexagon hole

4

Shaft

5

Seal

Do not apply excessive force to the stop valve. Doing
so may break the valve body, as the valve is not a
backseat type. Always use the special tool.

Stop valve size

Tightening torque N•m (Turn clockwise to close)

Shaft

Cap (valve lid)

Service port

Valve body

Hexagonal 

wrench

Ø9.5

5.4~6.6

4 mm

13.5~16.5

11.5~13.9

Ø15.9

13.5~16.5

6 mm

23.0~27.0

Ø19.1

27.0~33.0

8 mm

22.5~27.5

Ø25.4

The refrigerant leak detection function can not be used.

When charging a system, charging over the
permissible quantity can cause liquid hammer.

Always use protective gloves and protect your eyes
when charging refrigerant.

When the refrigerant charging procedure is done or
when pausing, close the valve of the refrigerant tank
immediately. If the tank is left with the valve open, the
amount of refrigerant which is properly charged may
get off point. More refrigerant may be charged by any
remaining pressure after the unit has stopped.

Electric shock warning

Close the electric box lid before turning on the main
power.

Perform the settings on the circuit board (A1P) of the
outdoor unit and check the LED display after the
power is on via the service lid which is in the lid of the
electric box. 
Operate switches with an insulated
stick (such as a ball-point pen) to
avoid touching the life parts. 
Make sure to re-attach the
inspection cover into the switch box cover after the job
is finished.

Make sure to turn ON the power 6 hours before
starting the operation. This is necessary to warm the
crankcase by the electric heater.

If operation is performed within 12 minutes after the air
handling unit and outdoor units are turned on, the
H2P-LED will be lit and the compressor will not
operate.

Содержание ERQ200A7W1B

Страница 1: ...INSTALLATION MANUAL ERQ125A7W1B ERQ200A7W1B ERQ250A7W1B Inverter condensing unit...

Страница 2: ...e 100 mm a 200 mm b 300 mm e 400 mm A B C D A B 3 a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm f 600 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm f 500 mm 4 a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a...

Страница 3: ...ne of the actions to achieve this is the reuse of reclaimed refrigerant in units produced and sold in Europe For more information about the countries that are in scope visit http www daikin eu loop by...

Страница 4: ...of sides A C have no impact on service space dimensions Refer to figure 2 for impact of wall heights of sides B D on service space dimensions In case of an installation site where only the sides A B h...

Страница 5: ...equipment and electric wires keeping proper distances away from stereo equipment personal computers etc See figure 3 In places with weak reception keep distances of 3 m or more to avoid electromagnet...

Страница 6: ...within a distance of 150 mm under the unit in order to prevent infiltration of water coming from under the unit When installed in a corrosive environment use a nut with plastic washer 1 to protect the...

Страница 7: ...nched piping 1 Remove the valve lid and make sure that the stop valves are fully closed 2 Connect a charge hose to service ports of all stop valves 3 Recover gas and oil from the pinched piping by usi...

Страница 8: ...ying out piping work in the field Be sure that the field installed piping does not touch other pipes the bottom panel or side panel Especially for the bottom and side connection be sure to protect the...

Страница 9: ...side stop valve Gas side stop valve Performing the airtightness test and vacuum drying Valve A must always be shut Otherwise the refrigerant in the unit will pour out Close Open Open Close Close NOTE...

Страница 10: ...rmistor discharge M1C M3C R50 R59 Resistor R95 Resistor current limiting S1NPH Pressure sensor high S1NPL Pressure sensor low S1PH S3PH Pressure switch high SD1 Safety devices input T1A Current sensor...

Страница 11: ...und wires and lightning rods dangerous when struck by lightning due to abnormal rise in electrical potential in the grounding This unit uses an inverter and therefore generates noise which will have t...

Страница 12: ...s plug the holes with packing materials to be prepared on site 2 3 1 Use a power wire pipe for the power wiring Outside the unit make sure the weak low voltage electric wiring i e for the remote contr...

Страница 13: ...V 3N 50 Hz 2 Fuse 3 Earth leakage breaker 4 Grounding wire 5 Power supply terminal block 6 Connect each power wire RED to L1 WHT to L2 BLK to L3 and BLU to N 7 Ground wire GRN YLW 8 Clamp the power wi...

Страница 14: ...FRIGERANT The outdoor unit is factory charged but depending on the length of the piping when installed the outdoor unit may require additional charging For charging the additional refrigerant follow t...

Страница 15: ...it and installation conditions on page 12 are completed If the stop valve is left open without turning on the power it may cause refrigerant to build up in the compressor leading to insulation degrada...

Страница 16: ...Micro computer operation monitor Mode Ready Error Cooling Heating changeover Low noise Demand Multi Indivi dual Bulk master Bulk slave HAP H1P H2P H3P H4P H5P H6P H7P H8P Single outdoor unit system c...

Страница 17: ...an insulated stick such as a ball point pen to avoid touching live parts Make sure to re attach the inspection cover 1 into the switch box cover 2 after the job is finished WARNING ELECTRIC SHOCK Cau...

Страница 18: ...d adjust the LED indication to either one of the possible settings as shown below in the field marked 2 Push the button and the setting is defined 1 LED H1 8P 2 Push button switches BS1 BS5 3 Dip swit...

Страница 19: ...ons A additional refrigerant charging operation not applicable B refrigerant recovery operation vacuuming operation C setting of high static pressure D automatic low noise operation setting at nightti...

Страница 20: ...recting the abnormality Correcting after abnormal completion of the test operation The test operation is only completed if there is no malfunction code displayed on the remote controller In case of a...

Страница 21: ...ier than air Procedure for checking maximum concentration Check the maximum concentration level in accordance with steps 1 to 4 below and take whatever action is necessary to comply 1 Calculate the am...

Страница 22: ......

Страница 23: ...F2 1 6 5 4 C H SELECTOR TO IN D UNIT A1P 3 2 F1 F2 13 L1 L2 L3 N 1 3 4 2 6 5 7 8 9 10 11 14 1 9 2 3 8 L1 L2 TO IN D F1 F2 A1P F1 F2 L N P1 P2 2 3 6 7 4 5 15 1 2 5 6 4 3 7 8 21 12 13 14 15 16 5 1 7 10...

Страница 24: ...4PW51323 1D 2022 10 Copyright 2009 Daikin 3...

Отзывы: