
8
|
Electrical installation
Installer reference guide
92
ERLA EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1A – 2020.05
A
1
2
4
5
S6S
S7S
S8S
S9S
3
B
A
B
A8P
X801M
1
2
3
4
5
a
a
Installation of EKRP1AHTA is required.
4
Fix the cable with cable ties to the cable tie mountings.
8.3.11 To connect the safety thermostat (normally closed contact)
1
"6.2.4 To open the indoor unit"
43]):
1
Top panel
1
2
3
2
Upper front panel
3
Upper switch box cover
Main zone
Wires: 2×0.75 mm²
—
2
Connect the safety thermostat (normally closed) cable to the appropriate
terminals as shown in the illustration below.
Содержание ERLA03DAV3
Страница 1: ...Installer reference guide Daikin Altherma 3 R F ERLA03DAV3 EHFZ03S18DJ3V...
Страница 182: ...1 7 Field settings table 6 8 2 ID9E51 Applicable units EHFZ03S18DJ3V Notes 4P596829 1 2019 10...
Страница 189: ......
Страница 190: ......
Страница 191: ......
Страница 192: ...4P596821 1A 2020 05 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...