
6
|
Unit installation
Installer reference guide
51
ERLA EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1A – 2020.05
6.5 Finishing the outdoor unit installation
6.5.1 To finish the outdoor unit installation
DANGER: RISK OF ELECTROCUTION
▪
Make sure that the system is earthed properly.
▪
Turn off the power supply before servicing.
▪
Install the service cover before turning on the power supply.
NOTICE
It is recommended that the refrigerant piping between indoor and outdoor unit is
installed in a ducting or the refrigerant piping is wrapped with finishing tape.
1
Insulate and fix the refrigerant piping and cables as follows:
g
b
a
f
e
c
d
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Field wiring (if applicable)
e
Liquid pipe
f
Liquid pipe insulation
g
Finishing tape
2
Install the service cover.
Содержание ERLA03DAV3
Страница 1: ...Installer reference guide Daikin Altherma 3 R F ERLA03DAV3 EHFZ03S18DJ3V...
Страница 182: ...1 7 Field settings table 6 8 2 ID9E51 Applicable units EHFZ03S18DJ3V Notes 4P596829 1 2019 10...
Страница 189: ......
Страница 190: ......
Страница 191: ......
Страница 192: ...4P596821 1A 2020 05 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...