15
|
Unit installation
Installer and user reference guide
60
EKVDX32~100A2VEB
VRV system air conditioner
4P664010-1 – 2021.08
1
Connect the canvas duct to the inside of the flange on the outlet side. For
connecting the canvas duct, use accessory screws.
2
Connect the duct to the canvas duct.
g
c
b a
f e d
d h
f
a
Screws for duct flanges (accessory)
b
Duct flange, rectangular (installed on the unit)
c
Indoor unit
d
Insulation (field supply)
e
Canvas duct (field supply)
f
Aluminium tape (field supply)
g
Duct flange, round reducer (installed on the unit)
h
Round duct
3
Wind aluminium tape around the flange and duct connections. Make sure
there are no air leaks at any other connection.
4
Insulate the inlet and outlet ducts to prevent condensation. Use glass wool or
polyethylene foam 25 mm thick.
15.2.3 Guidelines when installing the drain piping
▪
Pipe length.
Keep drain piping as short as possible.
▪
Pipe size.
Keep the pipe size equal to or greater than that of the connecting pipe
(vinyl pipe of 20 mm nominal diameter and 26 mm outer diameter).
▪
Slope.
Make sure the drain piping slopes down (at least 1/100) to prevent air
from being trapped in the piping. Use hanging bars as shown.
1~1.5 m
a
a
Hanging bar
Allowed
Not allowed
▪
Condensation.
Take measures against condensation. Insulate the complete drain
piping in the building.
▪
Rising piping
. If necessary to make the slope possible, you can install rising
piping.
-
Drain hose inclination: 0~75 mm to avoid stress on the piping and to avoid air
bubbles.
≤625
≤300
0~75
1000~1500
(mm)
b
a
b
a
d
d
c
a
Metal clamp (accessory)
Содержание EKVDX-A
Страница 95: ......
Страница 96: ...4P664010 1 2021 08 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...