5
x
Operation
E EKSRDS1A
Control and pump unit for solar systems
4PW56033-1
Operating and installation instructions
25
DT
Nominal spread (calculated for the working point)
S1
Upper nominal spread (“spread 1")
S2
Tower nominal spread (“spread 2")
T
K
Solar panel temperature
T1
Minimum temperature of storage tank ("T
R
min")
T2
Booster temperature ("TK max")
T3
Cut-in protection temperature (“TK zul”)
—
Nominal spread
---
Switching limits for pump modulation
Fig. 5-3
Temperature difference-dependent pump output control
A
Start phase
B
Operating phase (modulation)
C
Flow stall
D
Low pump output stages are automatically blocked
after flow stall
V
Flow in solar panel circuit
V1
Minimum flow in start phase ("VS min")
V2
Minimum flow in operating phase ("S-flow")
t
Time
t
1
Start run time of the solar panel circuit pump at 100%
("Time PsE")
t
2
Stabilisation time ("S-time")
t
3
Stall detection time (10 s)
Fig. 5-4
Example of modulation operation with blockage of the lower pump stages in systems with FlowSensor when the
minimum flow rate is not achieved
1K
1K
Ps
Ps
S2
S1
DT/K
T / °C
K
T1
T2
T3
Ps
?
100%
Ps 0%
Ps 100%
5K
BSK=1
BSK=0
V/l/m
in
t / sec
Ps100%
A
A
B
B
t
3
t
1
t
2
t
2
t
2
t
2
C
D
V2
V1
0
2
4
6
8
10
12
14
0
100
200
300
400
500
600
700
800
900
1000
Содержание EKSR3PA
Страница 2: ......
Страница 40: ...4PW56033 1 Copyright Daikin...