The indoor unit is installed 5 m below the highest point in the water circuit. The
total water volume in the water circuit is 100 l.
No actions or adjustments are required.
Example 2
The indoor unit is installed at the highest point in the water circuit. The total water
volume in the water circuit is 250 l.
Actions:
▪
Because the total water volume (250 l) is more than the default water volume
(200 l), the pre-pressure must be decreased.
▪
The required pre-pressure is:
Pg = (0.3+(H/10)) bar = (0.3+(0/10)) bar = 0.3 bar
▪
The corresponding maximum water volume at 0.3 bar is 290 l. (See the graph in
▪
Because 250 l is lower than 290 l, the expansion vessel is appropriate for the
installation.
8.6 Connecting water piping
8.6.1 About connecting the water piping
Before connecting the water piping
Make sure the outdoor and indoor unit are mounted.
Typical workflow
Connecting the water piping typically consists of the following stages:
1
Connecting the water piping to the indoor unit.
2
Connecting the recirculation piping.
3
Connecting the drain hose to the drain.
4
Filling the water circuit.
5
Filling the domestic hot water tank.
6
Insulating the water piping.
8.6.2 Precautions when connecting the water piping
8.6.3 To connect the water piping
NOTICE
Do NOT use excessive force when connecting the piping. Deformation of the piping
can cause malfunctioning of the unit.
To facilitate service and maintenance, 4 shut-off valves and 1 overpressure bypass
valve are provided. Mount the shut-off valves on the space heating water inlets
and space heating water outlets. To ensure the minimum flow rate (and prevent
overpressure), install the
overpressure bypass valve
on the space heating water
outlet for the
additional zone
.
Содержание EHVZ04S18EA6V
Страница 269: ......
Страница 270: ......
Страница 271: ......
Страница 272: ...4P629093 1A 2021 11 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...