Si18-525B
Test Operation
Test Operation
161
1.1.3 Judging and reprogramming in case of redundant BP addresses
The BP unit of this system is provided with specific addresses in its production stage. These
addresses are used to conduct various controls. If by any chance (on 3 out of 260000 units)
these addresses are redundant, the system may get in trouble. When replacing the PCB of the
BP unit too, these addresses may be used repeatedly.
Address redundancy checking flowchart
Reprogramming the PCB addresses of BP unit
Modify the DIP switch (DS2) settings on the BP unit's PCB in the following way.
With the system set up, power on both the
outdoor unit and BP unit.
The compressor is in a non-startup
condition.
Example: thermostat control off,
alarm being issued, heating with
high outdoor
air temperature, compressor
failure, etc.
BP addresses redundancy.
Reprogram the addresses.
Normal
Set the outdoor unit PCB in the monitor mode
and check the number of indoor units being
connected.
Is the number of connected indoor units correct?
Give a start command from the indoor unit. Does
the compressor start in 20 minutes? (Test run
cannot be made either.)
No
No
Yes
Yes
(Q0517)
(Q0444)
H1P (LED A)
H2P (LED 1)
H3P (LED 2)
H4P (LED 3)
H5P (LED 4)
OFF ON
DS2-1
DS2-2
DS2-3
DS2-4
DS2
Содержание D-Series
Страница 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Страница 33: ...List of Functions Si18 525B 20 List of Functions ...
Страница 34: ...Si18 525B Specifications 21 Part 2 Specifications 1 Specifications 22 1 1 Cooling Only 22 1 2 Heat Pump 42 ...
Страница 71: ...Specifications Si18 525B 58 Specifications ...
Страница 107: ...Printed Circuit Board Connector Wiring Diagram Si18 525B 94 Printed Circuit Board Connector Wiring Diagram ...
Страница 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Страница 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Страница 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Страница 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Страница 443: ...BP Unit Si18 525B 430 Removal Procedure The clamps are to be kept in stock Step Procedure Points Clamps Q0529 ...
Страница 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Страница 475: ...Si18 525B vi Index ...