BP Unit Control
Si18-525B
128
Function
6.
BP Unit
Control
6.1
BP Unit Command Conversion
1.
∆
D (room temperature
−
temperature setting) signals from BP units are converted to
capacity up / down signal.
∆
D signals from BP units are used as the capacity up / down signal in frequency commands
(excludes when Powerful function is in operation).
2. Processing during Powerful operation mode
(1) When Powerful command is received from indoor units (one or more units)
(2) Thermostats are not OFF in room units from which Powerful commands are issued
When the above conditions are met, the Powerful operation mode is activated, and the
Powerful operation signal is sent to outdoor unit.
∆
D Signal
Capacity up / down signal
0
Thermostat OFF
1
Down
2
3
Keep
4
5
Up
6
7
8
9
A
B
C
D
E
F
Содержание D-Series
Страница 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Страница 33: ...List of Functions Si18 525B 20 List of Functions ...
Страница 34: ...Si18 525B Specifications 21 Part 2 Specifications 1 Specifications 22 1 1 Cooling Only 22 1 2 Heat Pump 42 ...
Страница 71: ...Specifications Si18 525B 58 Specifications ...
Страница 107: ...Printed Circuit Board Connector Wiring Diagram Si18 525B 94 Printed Circuit Board Connector Wiring Diagram ...
Страница 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Страница 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Страница 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Страница 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Страница 443: ...BP Unit Si18 525B 430 Removal Procedure The clamps are to be kept in stock Step Procedure Points Clamps Q0529 ...
Страница 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Страница 475: ...Si18 525B vi Index ...