Si18-525B
Special Control
Function
117
3.3
Defrosting Operation
The defrost operation is performed to solve frost on the outdoor unit heat exchanger when
heating, and the heating capacity is recovered.
[Conditions to start]
The defrost operation is started referring following conditions.
Outdoor heat exchanger heat transfer co-efficiency
Temperature of heat-exchange (Tb)
Low pressure equivalent saturation temperature (Te)
Timer (2 hours at the minimum)
In addition, outdoor heat-exchange co-efficiency is derived from Tc, Te, and the compressor
load.
* From the preparing operation to the defrost operation, and from the defrost operation to the
operation after defrost, the compressor stops for 110 sec. to reduce noise on changing of the
four way valve.
Outdoor unit actuator
Defrost preparation
operation
Defrost operation
Post Defrost operation
Compressor
Upper limit control
140 Hz
2-step increase from
52 Hz to
(Pc - Pe>0.4 MPa)
every 20 sec.
Outdoor unit fan
STEP8
OFF
STEP8
Four way valve
ON
OFF
ON
Main electronic expansion valve
(EV1)
SH control
2000 pls
200~400 pls
Subcooling electronic expansion
valve (EV2)
0 pls
0 pls
0 pls
Hot gas bypass valve (SVP)
OFF
ON
ON
Receiver gas discharging valve
(SVG)
ON
→
OFF
ON
→
OFF
ON
→
OFF
Ending conditions
130 sec.
•
Max. 18 min.
•
Tb >11
°
C
•
160 sec.
•
Pc - Pe>0.4MPa
or
or
Indoor actuator
During defrost
Indoor unit fan
Thermostat ON unit
OFF
Stopping unit
OFF
Thermostat OFF unit
OFF
BP unit electronic expansion
valve
Thermostat ON unit
SH control
Stopping unit
80 pls
Thermostat OFF unit
SH control
Содержание D-Series
Страница 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Страница 33: ...List of Functions Si18 525B 20 List of Functions ...
Страница 34: ...Si18 525B Specifications 21 Part 2 Specifications 1 Specifications 22 1 1 Cooling Only 22 1 2 Heat Pump 42 ...
Страница 71: ...Specifications Si18 525B 58 Specifications ...
Страница 107: ...Printed Circuit Board Connector Wiring Diagram Si18 525B 94 Printed Circuit Board Connector Wiring Diagram ...
Страница 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Страница 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Страница 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Страница 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Страница 443: ...BP Unit Si18 525B 430 Removal Procedure The clamps are to be kept in stock Step Procedure Points Clamps Q0529 ...
Страница 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Страница 475: ...Si18 525B vi Index ...