4
|
Before operation
User reference guide
14
FTXA25~50(A)(B)2V1B(W)(S)(T)(B)
Daikin room air conditioner
4P518786-1F – 2020.05
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
▪
Fixing the user interface to the wall.
▪
Inserting the batteries in the user interface.
▪
Setting the brightness of the user interface display.
▪
Setting the clock.
▪
Setting the indoor unit position.
▪
Turning on the power supply.
4.2 To fix the user interface to the wall
c
b
a
2×
a
User interface
b
Screws (field supply)
c
User interface holder
1
Choose a place where the signals reach the unit.
2
Attach the holder with screws to the wall or a similar location.
3
Hang the user interface on the user interface holder.
4.3 To insert the batteries
The batteries will last for about 1 year.
1
Remove the front cover.
2
Insert both batteries at once.
3
Put back the front cover.
Содержание CTXA15A2V1BW
Страница 54: ......
Страница 55: ......
Страница 56: ...4P518786 1F 2020 05 Copyright 2017 Daikin Verantwortung f r Energie und Umwelt...