background image

7 Electrical installation

Installation manual

12

ATXF20~42E5V1B

Daikin room air conditioner

3P650253-11H – 2022.10

3

Discharge all nitrogen gas.

6.3.2

To perform vacuum drying

1

Vacuum the system until the pressure on the manifold indicates
−0.1 MPa (−1 bar).

2

Leave as is for 4-5 minutes and check the pressure:

If the pressure…

Then…

Does not change

There is no moisture in the
system. This procedure is
finished.

Increases

There is moisture in the
system. Go to the next step.

3

Vacuum the system for at least 2 hours to a manifold pressure
of −0.1 MPa (−1 bar).

4

After  turning  the  pump  OFF,  check  the  pressure  for  at  least
1 hour.

5

If  you  do  NOT  reach  the  target  vacuum  or  CANNOT  maintain
the vacuum for 1 hour, do the following:

▪ Check for leaks again.
▪ Perform vacuum drying again.

7

Electrical installation

DANGER: RISK OF ELECTROCUTION

WARNING

ALWAYS use multicore cable for power supply cables.

WARNING

Use  an  all-pole  disconnection  type  breaker  with  at  least
3  mm  between  the  contact  point  gaps  that  provides  full
disconnection under overvoltage category III.

WARNING

If the supply cord is damaged, it MUST be replaced by the
manufacturer,  its  service  agent  or  similarly  qualified
persons in order to avoid a hazard.

WARNING

Do NOT connect the power supply to the indoor unit. This
could result in electrical shock or fire.

WARNING

▪ Do  NOT  use  locally  purchased  electrical  parts  inside

the product.

▪ Do  NOT  branch  the  power  supply  for  the  drain  pump,

etc.  from  the  terminal  block.  This  could  result  in
electrical shock or fire.

WARNING

Keep  the  interconnection  wiring  away  from  copper  pipes
without thermal insulation as such pipes will be very hot.

7.1

Specifications of standard wiring
components

NOTICE

We recommend using solid (single-core) wires. If stranded
wires are used, twist the conductor to consolidate the end
or  twist  the  conductor  to  consolidate  the  end  in
combination with the usage of a round crimp-style terminal
on  the  end  of  the  conductor.  Details  are  described  in
"Guidelines  when  connecting  the  electrical  wiring"  in  the
installer reference guide.

Component

Power supply cable Voltage

220~240 V

Phase

1~

Frequency

50 Hz

Wire sizes

Must comply with

applicable legislation

Interconnection cable

Minimum cable section of

2.5 mm² and applicable

for 220~240 V

Recommended field fuse

20 A

Earth leakage circuit breaker

Must comply with

applicable legislation

7.2

To connect the electrical wiring to
the indoor unit

WARNING

Provide adequate measures to prevent that the unit can be
used  as  a  shelter  by  small  animals.  Small  animals  that
make contact with electrical parts can cause malfunctions,
smoke or fire.

NOTICE

▪ Keep  the  power  line  and  transmission  line  apart  from

each  other.  Transmission  wiring  and  power  supply
wiring may cross, but may NOT run parallel.

▪ In  order  to  avoid  any  electrical  interference,  the

distance  between  both  wirings  should  ALWAYS  be  at
least 50 mm.

Electrical  work  should  be  carried  out  in  accordance  with  the
installation manual and the national electrical wiring rules or code of
practice.

1

Set  the  indoor  unit  on  the  mounting  plate  hooks.  Use  the  " "
marks as a guide.

b

a

c

a

Mounting plate (accessory)

b

Interconnection cable

c

Wire guide

2

Open  the  front  panel,  and  then  the  service  cover.  Refer  to  the
Installer reference guide for opening procedure. For location of
the  installer  reference  guide  refer  to 

"1  About  the

documentation"

 [

4

 4].

Содержание ATXF35E

Страница 1: ...on manual Daikin room air conditioner ATXF20E5V1B ATXF25E5V1B ATXF35E5V1B ATXF42E5V1B Questo manuale d istruzione fornito da trovaprezzi it Scopri tutte le offerte per Daikin ATXF35E o cerca il tuo pr...

Страница 2: ...miniai bus eksploatuojami laikantis m s instrukcij atbilst d m direkt v m vai regul m ja vien ie izstr d jumi tiek lietoti saska ar m su instrukcij m s v zhode s nasleduj cou imi smernicou ami alebo p...

Страница 3: ...are used in accordance with our instructions as amended S I 2016 1101 Electrical Equipment Safety Regulations 2016 S I 2016 1091 Electromagnetic Compatibility Regulations 2016 S I 2008 1597 Supply of...

Страница 4: ...run 15 10 2 1 To perform a test run in winter season 15 11 Disposal 15 12 Technical data 16 12 1 Wiring diagram 16 12 1 1 Unified wiring diagram legend 16 1 About the documentation 1 1 About this docu...

Страница 5: ...sucked in This will cause abnormal pressure in the refrigeration cycle which may result in equipment damage and even injury CAUTION Incomplete flaring may cause refrigerant gas leakage Do NOT re use f...

Страница 6: ...them with bare hands DANGER RISK OF ELECTROCUTION Disconnect the power supply for more than 10 minutes and measure the voltage at the terminals of main circuit capacitors or electrical components befo...

Страница 7: ...n and with applicable legislation and are executed ONLY by authorised persons 5 1 1 Installation site requirements of the indoor unit INFORMATION The sound pressure level is less than 70 dBA Air flow...

Страница 8: ...and firmly engage the 3 upper hooks 2 Install 2 screws back on the front grille 3 Install the air filter and then mount the front panel 5 2 5 To remove the electrical wiring box cover 1 Remove the fr...

Страница 9: ...t cover INFORMATION To connect the piping on right side right bottom left side or left bottom the pipe port cover MUST be removed 1 Cut off the pipe port cover from inside the front grille using a cop...

Страница 10: ...t side and install it on the left side 1 Remove the insulation fixing screw on the right side and remove the drain hose 2 Remove the drain plug on the left side and attach it to the right side NOTICE...

Страница 11: ...e a spanner and torque wrench together to tighten the flare nut when connecting the piping This to prevent nut cracking and leaks a b c d a Torque wrench b Spanner c Piping union d Flare nut Piping si...

Страница 12: ...thout thermal insulation as such pipes will be very hot 7 1 Specifications of standard wiring components NOTICE We recommend using solid single core wires If stranded wires are used twist the conducto...

Страница 13: ...rap refrigerant piping interconnection cable and drain hose together using insulation tape Overlap at least half the width of the tape with each turn d e c b f a 2 a Drain hose b Interconnection cable...

Страница 14: ...he operation lamp was blinking repeat the setting process from the beginning 9 When the setting is complete press Model Button FTXF ATXF Result The user interface will return to the previous screen 10...

Страница 15: ...ary 2 When the test run is finished set the temperature to a normal level In cooling mode 26 28 C in heating mode 20 24 C 3 The system stops operating 3 minutes after the unit is turned OFF 10 2 1 To...

Страница 16: ...Meaning A P Printed circuit board BS Pushbutton ON OFF operation switch BZ H O Buzzer C Capacitor AC CN E HA HE HL HN HR MR _A MR _B S U V W X A K R_ NE Connection connector D V D Diode DB Diode brid...

Страница 17: ...3P650253 11H 2022 10 Symbol Meaning V R Diode bridge Insulated gate bipolar transistor IGBT power module WRC Wireless remote controller X Terminal X M Terminal strip block Y E Electronic expansion va...

Страница 18: ......

Страница 19: ......

Страница 20: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P650253 11H 2022 10 Copyright 2...

Отзывы: