
Indoor Unit
SiBE04-809
132
Removal Procedure
1.3
Removal of Assembly of Front Panel Mechanism
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
Remove the front grille.
1. Remove the assembly of
front panel mechanism.
1
The back of the front
grilles
2
Loosen the 2 screws of
the assembly (left).
3
Remove the assembly.
When assembling, insert the
lower rack plate first.
4
Lift the shaft and pull it
out to the rightward.
Be careful so as not to lose
the drive gear.
Assy. of front panel
mechanism (right)
Assy. of front panel
mechanism (left)
(R5023)
Lower rack plate
(R5025)
Shaft
(R5026)
Содержание ARXG25E3V1B
Страница 1: ...SiBE04 809 Applied Models Inverter Pair Heat Pump Inverter Pair Wall Mounted Type E Series ...
Страница 11: ...Introduction SiBE04 809 x ...
Страница 12: ...SiBE04 809 List of Functions 1 Part 1 List of Functions 1 List of Functions 2 ...
Страница 14: ...SiBE04 809 Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Страница 23: ...Printed Circuit Board Connector Wiring Diagram SiBE04 809 12 Printed Circuit Board Connector Wiring Diagram ...
Страница 207: ...Wiring Diagrams SiBE04 809 196 Appendix ...