
3
|
Components
Service manual
242
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
2
2
2
1
4×
3.55 N • m
a
a
Speed nut
3.17.7 To install the discharge grille
1
Insert the hooks. To prevent breaking the hooks:
▪
First insert the bottom hooks (2×).
▪
Then insert the top hooks (2×).
2
Insert and fix the screws (4×)(delivered as accessory).
1
2
2
1
4 N • m
4×
T25
3.18 Reactor
INFORMATION
Procedures are ONLY for reactors of the single phase outdoor unit.
NO procedures available for reactors of the 3‑phase outdoor unit.
Содержание ALTHERMA
Страница 357: ...11 11 ...
Страница 358: ......
Страница 359: ......
Страница 360: ...ESIE20 06A 2021 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...