6 Electrical installation
Installation manual
25
EBLA04~E23V3 + EDLA04~E23V3
Daikin Altherma 3 M
4P685229-1A – 2022.05
6.3.7
To connect the electricity meters
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied
by PCB)
[9.A]
Energy metering
INFORMATION
In case of an electricity meter with transistor output, check
the polarity. The positive polarity MUST be connected to
X5M/6 and X5M/4; the negative polarity to X5M/5 and
X5M/3.
1
Access the electrical connections. See
electrical wiring to the outdoor unit"
2
Connect the electricity meters cable to the appropriate terminals
as shown in the illustration below.
X5M.6
S2S
S3S
X5M.5
X5M.4
X5M.3
180°
X5M
3 4 5 6
3
Fix the cable with cable ties to the cable tie mountings.
6.3.8
To connect the domestic hot water pump
Wires: (2+GND)×0.75 mm²
DHW pump output. Maximum load: 2 A (inrush), 230 V AC,
1 A (continuous)
[9.2.2]
DHW pump
[9.2.3]
DHW pump schedule
1
Access the electrical connections. See
electrical wiring to the outdoor unit"
2
Connect the domestic hot water pump cable to the appropriate
terminals as shown in the illustration below.
X2M.2
X2M.1
M2P
M
1~
180°
2
1
X2M
3
Fix the cable with cable ties to the cable tie mountings.
6.3.9
To connect the alarm output
Wires: (2+1)×0.75 mm²
Maximum load: 0.3 A, 250 V AC
[9.D]
Alarm output
1
Access the electrical connections. See
electrical wiring to the outdoor unit"
17].
2
Connect the alarm output cable to the appropriate terminals as
shown in the illustration below.
7 9
YC
Y1
X2M
1
2
3
A4P
1+2
Wires connected to the alarm
output
3
Wire between X2M and A4P
A4P
Installation of EKRP1HBAA is
required.
X2M.7
A4P.Y1