Commissioning
Installer reference guide
154
C08AF + EHYKOMB33A
Daikin Altherma R Hybrid
4P471761-1E – 2020.10
The
gas boiler
is properly mounted.
The following
field wiring
has been carried out according to this document and the
applicable legislation:
▪
Between the local supply panel and the outdoor unit
▪
Between indoor unit and outdoor unit
▪
Between the local supply panel and the indoor unit
▪
Between the indoor unit and the valves (if applicable)
▪
Between the indoor unit and the room thermostat (if applicable)
▪
Between the indoor unit and the domestic hot water tank (if applicable)
▪
Between the gas boiler and the local supply panel (only applicable in case of hybrid
system)
The
communication cable
between the gas boiler and the indoor unit is properly mounted.
The system is properly
earthed
and the earth terminals are tightened.
The
fuses
or locally installed protection devices are installed according to this document,
and have NOT been bypassed.
The
power supply voltage
matches the voltage on the identification label of the unit.
There are NO
loose connections
or damaged electrical components in the switch box.
There are NO
damaged components
or
squeezed pipes
on the inside of the indoor and
outdoor units.
There are NO
refrigerant leaks
.
The
refrigerant pipes
(gas and liquid) are thermally insulated.
The correct pipe size is installed and the
pipes
are properly insulated.
There is NO
water leak
inside the indoor unit.
There is NO
water leak
inside the gas boiler.
There is NO
water leak
in the connection between the gas boiler and the indoor unit.
The
shut-off valves
are properly installed and fully open (field supply).
The
stop valves
(gas and liquid) on the outdoor unit are fully open.
The
air purge
valve is open (at least 2 turns).
The
pressure relief valve
purges water when opened. Clean water must come out.
The
gas boiler
is switched ON.
Setting . is correctly set on the gas boiler. The setting must be 0.
The
minimum water volume
is guaranteed in all conditions. See "To check the water
10.4 Checklist during commissioning
The order mentioned in following commissioning checklist MUST be followed.
To perform a
wiring
check.
The
minimum flow rate
is guaranteed in all conditions. See "To check the water volume
and flow rate" in