Basic Control
ESIE09-08A
56
Function
2.2 Compressor PI Control
Compressor PI Control
Carries out the compressor capacity PI control to maintain Tc at constant during heating operation to
ensure stable unit performance.
Outdoor compressor (R-410A)
Indoor compressor (R-134a)
11kW -> max. 21 steps
14kW -> max. 26 steps
16kW -> max. 30 steps
STn
INV(Fullload) INV(Unload)
STn
INV(Fullload) INV(Unload)
STn
INV(Fullload) INV(Unload)
1
36.0Hz
11
80.0Hz
21
140.0Hz
2
39.0Hz
12
86.0Hz
22
146.0Hz
3
43.0Hz
13
92.0Hz
23
152.0Hz
4
47.0Hz
14
98.0Hz
24
158.0Hz
5
52.0Hz
15
104.0Hz
25
164.0Hz
6
52.0Hz
57.0Hz
16
110.0Hz
26
170.0Hz
7
57.0Hz
64.0Hz
17
116.0Hz
27
175.0Hz
8
62.0Hz
71.0Hz
18
122.0Hz
28
180.0Hz
9
68.0Hz
78.0Hz
19
128.0Hz
29
185.0Hz
10
74.0Hz
20
134.0Hz
30
190.0Hz
STEP
INV
STEP
INV
STEP
INV
1
40.0Hz
11
98.0Hz
21
158.0Hz
2
46.0Hz
12
104.0Hz
22
164.0Hz
3
52.0Hz
13
110.0Hz
23
170.0Hz
4
57.0Hz
14
116.0Hz
24
174.0Hz
5
62.0Hz
15
122.0Hz
25
182.0Hz
6
68.0Hz
16
128.0Hz
26
188.0Hz
7
74.0Hz
17
134.0Hz
27
194.0Hz
8
80.0Hz
18
138.0Hz
28
200.0Hz
9
86.0Hz
19
144.0Hz
29
206.0Hz
10
92.0Hz
20
152.0Hz
30
210.0Hz
Compressors may operate in a pattern other than those listed in above tables subject to the operating conditions.
Selection of full load operation to/from unload operation is made with the unload circuit solenoid valve (Y3S=SVUL). The full
load operation is performed with the SVUL set to OFF, while the unload operation is performed with the SVUL set to ON.
Содержание ALTHERMA HT EKBUHAA6 V3
Страница 2: ......
Страница 7: ...ESIE09 08A Table of Contents v 1 3 Service Tools 283 Index i Drawings Flow Charts iii ...
Страница 13: ...ESIE09 08A General Information 1 Part 1 General Information 1 Model Names of Indoor Outdoor Units Tanks 2 ...
Страница 16: ...Model Names of Indoor Outdoor Units Tanks ESIE09 08A 4 General Information ...
Страница 17: ...ESIE09 08A Specifications 5 Part 2 Specifications 1 Specifications 6 1 1 Outdoor Units 6 1 2 Indoor Unit 8 ...
Страница 28: ...Refrigerant Circuit ESIE09 08A 16 Refrigerant Circuit EKHBRD 011 014 016 AB AC V1 Y1 ...
Страница 38: ...Functional Parts Layout ESIE09 08A 26 Refrigerant Circuit 2 6 EKHTSU 200 260 A AB AC Front view Tank sensor ...
Страница 40: ...Functional Parts Layout ESIE09 08A 28 Refrigerant Circuit ...
Страница 63: ...ESIE09 08A PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 Refrigerant Circuit 51 ...
Страница 64: ...PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 ESIE09 08A 52 Refrigerant Circuit ...
Страница 125: ...ESIE09 08A Field Setting Test Operation 113 ...
Страница 232: ...Troubleshooting by Indication on the Remote Controller ESIE09 08A 222 Troubleshooting ...
Страница 237: ...ESIE09 08A Piping Diagrams Appendix 227 EKHBRD 011 014 016 AB AC V1 Y1 ...
Страница 250: ...Wiring Diagrams ESIE09 08A 240 Appendix EKHBRD 011 014 016 AB AC V1 ...
Страница 251: ...ESIE09 08A Wiring Diagrams Appendix 241 ...
Страница 256: ...Wiring Diagrams ESIE09 08A 246 Appendix EKHBRD 011 014 016 AB AC Y1 ...
Страница 257: ...ESIE09 08A Wiring Diagrams Appendix 247 ...
Страница 260: ...Wiring Diagrams ESIE09 08A 250 Appendix ...
Страница 266: ...Method of Replacing the Inverter s Power Transistors Modules ESIE09 08A 256 Appendix Inverter PC board C C W U V ...
Страница 288: ...3 Way Valve ESIE09 08A 278 Appendix ...