ESIE06-03
General Functionality
Part 2 – Functional Description
2–5
3
2
4
5
1
1.3
Four Way Valve Switching
Outline of heating
operation
Heat pump
During the heating operation current must be conducted and during cooling and defrosting current
must not be conducted. In order to eliminate the switching sound (as the four way valve coil switches
from ON to OFF) when the heating is stopped, the delay switch of the four way valve must be carried
out after the operation stopped.
Detail
The OFF delay of four way valve.
Energize the coil for 150 sec after unit operation is stopped.
Содержание Altherma EKHBH Series
Страница 2: ...ESIE06 03 1 2 Part 1 System Outline 3 1 1 5 ...
Страница 26: ...Functional Diagrams ESIE06 03 1 26 Part 1 System Outline 3 1 1 4 5 ...
Страница 32: ...Piping Diagrams ESIE06 03 1 32 Part 1 System Outline 3 1 1 4 5 ...
Страница 38: ...Switch Box Layout ESIE06 03 1 38 Part 1 System Outline 3 1 1 4 5 ...
Страница 58: ...PCB Layout ESIE06 03 1 58 Part 1 System Outline 3 1 1 4 5 ...
Страница 60: ...ESIE06 03 2 2 Part 2 Functional Description 3 1 2 5 ...
Страница 68: ...Hydro box Functional Concept ESIE06 03 2 10 Part 2 Functional Description 3 1 2 4 5 ...
Страница 88: ...ESIE06 03 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Страница 134: ...Error Codes System Malfunctions ESIE06 03 3 48 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 152: ...Additional Checks for Troubleshooting ESIE06 03 3 66 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 154: ...ESIE06 03 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...
Страница 180: ...Removal procedure outdoor unit ERYQ005 007AAV3 ESIE06 03 5 28 Part 5 Disassembly and Maintenance 3 1 5 5 ...